3908 Greystone Dr
Austin, TX 78731
3908 Greystone Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 3908 Greystone Dr, Austin, TX 78731. The most recent, filed February 5, 2024, covers: “Replace cast iron under foundation”.
Compiled from City of Austin records · updated Feb 5, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 5, 2024
- since Feb 5, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace cast iron under foundation
- AppliedJan 29, 2024
- IssuedFeb 5, 2024
- WorkFeb '24 – Mar '24
- Final inspectionMar 4, 2024
Passed final inspection Mar 4, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace cast iron under foundation
Replace cast iron under foundation
City of Austin permitPlumbing PermitFinal- Record
- 2024-011299 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3908 Greystone Dr
What is being built at 3908 Greystone Dr?
The latest filing (City of Austin permit 2024-011299 PP, February 5, 2024) covers replace cast iron under foundation.
How many permits and filings does 3908 Greystone Dr have?
1 filing across 1 project, from February 5, 2024 to February 5, 2024.
Is there other construction near 3908 Greystone Dr?
Yes. Nearby filings include 3910 Greystone Dr (replacement of an existing water heater replace 50 gal nat gas water heater, Jul 8, 2025); 3912 Greystone Dr (replacement of complete existing central heat and air system with or without duct work replacement of complete existing central heat and air system with or without duct work install 2 ton american standard seer 2 rated 17 seer split system and 2 stage gas furnace, Dec 10, 2025); 3911 Greystone Dr (105 tunnel below the foundation to replace entire cast-iron drain system. 4 access holes - 1 on each side. 56 trench to replace yard sewer line, Dec 5, 2024).
How do I get alerts for new permits at 3908 Greystone Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 3910 Greystone DrJul 8, 2025Replacement of an existing water heater replace 50 gal nat gas water heater · 23 m away
- 3912 Greystone DrDec 10, 2025Replacement of complete existing central heat and air system with or without duct work replacement of complete existing central heat and air system with or without duct work install 2 ton american standard seer 2 rated 17 seer split system and 2 stage gas furnace · 46 m away
- 3911 Greystone DrDec 5, 2024105 tunnel below the foundation to replace entire cast-iron drain system. 4 access holes - 1 on each side. 56 trench to replace yard sewer line · 59 m away
- 3907 Greystone DrMar 25, 2026Tunnel under foundation to replace cast iron for 2 full bathrooms and half bathroom with kitchen and washer drain. will have 3 access holes one where drain line exits the foundation the second where bathroom is located on the the far right side of the home and the third access hole will be made by the garage total length of tunnel is 60 feet. sewer line will be replaced from the home to the city tap connection on the front left corner of the property total length of sewer line is approximately 55 feet · 71 m away
- 3915 Greystone DrJul 2, 2025To tunnel under the foundation to replace the cast-iron drain lines at the kitchen the laundry and the bathroom and install pvc · 82 m away
- 3903 Edgerock DrMar 25, 2026Replacement of complete existing central heat and air system with or without duct work replace existing 4-ton vertical gas split system with new 4-ton air conditioner two-stage 90 k btu variable-speed gas furnace and new thermostat; no structural change · 86 m away
- 3906 Edgerock DrMay 13, 2025*partial demolition* new uncovered wood deck and pergola for single-story sfr · 92 m away
- 3916 Greystone DrDec 10, 2025Disconnect/reconnect request for replacing 200 amp meter can and upgrading 200 amp main service panel · 100 m away
- 3904 Edgerock DrOct 27, 2025Installation of 5.85kw solar pv system with battery backup · 100 m away
- 3917 Edgerock DrNov 6, 2026Eplan: residential expedited review - new construction of 2-story single-family residence [4bed 4.5bath] with attached carport and connecting workshop · 102 m away
- 7504 Chimney CornersApr 22, 2026Upgrade service · 113 m away
- 3916 Edgerock DrJul 27, 2026Replumb under pier and beam home up to exterior cleanout · 125 m away