3903 Edgerock Dr: Central HVAC system replacement
A replacement central heating and air system was permitted at 3903 Edgerock Dr on March 25, 2026. The permit describes a new 4-ton air conditioner, gas furnace and thermostat, with no structural changes.
Summarized from City of Austin records · updated Mar 25, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Mar 25, 2026
- since Nov 22, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work replace existing 4-ton vertical gas split system with new 4-ton air conditioner two-stage 90 k btu variable-speed gas furnace and new thermostat; no structural change
- AppliedMar 24, 2026
- IssuedMar 25, 2026
- WorkMar '26 – Mar '26
- Final inspectionMar 30, 2026
Passed final inspection Mar 30, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsReplacement of complete existing central heat and air system with or without duct work replace existing 4-ton vertical gas split system with new 4-ton air conditioner two-stage 90 k btu variable-speed gas furnace and new thermostat; no structural change
Replacement of complete existing central heat and air system with or without duct work replace existing 4-ton vertical gas split system with new 4-ton air conditioner two-stage 90 k btu variable-speed gas furnace and new thermostat; no structural change
City of Austin permitMechanical PermitFinal- Record
- 2026-035327 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Gas piping for generator
Gas piping for generator
City of Austin permitPlumbing PermitFinal- Record
- 2023-150797 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install standby generator and transfer switch
Install standby generator and transfer switch
City of Austin permitElectrical PermitExpired- Record
- 2023-149654 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3903 Edgerock Dr
What is being built at 3903 Edgerock Dr?
A City of Austin permit indicates the existing central heating and air system is being replaced. The work includes a new 4-ton air conditioner, gas furnace and thermostat.
When was the HVAC replacement permitted at 3903 Edgerock Dr?
The mechanical permit, 2026-035327 MP, was filed March 25, 2026.
Is there new construction planned at 3903 Edgerock Dr?
The March 2026 permit describes HVAC replacement and says there will be no structural change. The records provided do not indicate a new building project.
Was a generator permitted at 3903 Edgerock Dr?
Records show an electrical permit to install a standby generator and transfer switch, filed November 22, 2023. That permit is listed as expired.
What work was permitted for the generator at 3903 Edgerock Dr?
A plumbing permit for gas piping for a generator was filed November 22, 2023, as permit 2023-150797 PP. The related electrical permit for the generator and transfer switch is listed as expired.
Also being built nearby
All of 78731- 7504 Chimney CornersApr 22, 2026Upgrade service · 29 m away
- 3904 Edgerock DrOct 27, 2025Installation of 5.85kw solar pv system with battery backup · 53 m away
- 3906 Edgerock DrMay 13, 2025*partial demolition* new uncovered wood deck and pergola for single-story sfr · 67 m away
- 7503 Chimney CornersOct 2, 2025Dig up ridged conduit because its rusted through and showing wire. replacing meter base and grounding service · 76 m away
- 7505 Chimney CornersOct 16, 2026Construct new driveway approach of 11.65 ft. no sidewalk inspection per plan review · 83 m away
- 3908 Greystone DrFeb 5, 2024Replace cast iron under foundation · 86 m away
- 3907 Greystone DrMar 25, 2026Tunnel under foundation to replace cast iron for 2 full bathrooms and half bathroom with kitchen and washer drain. will have 3 access holes one where drain line exits the foundation the second where bathroom is located on the the far right side of the home and the third access hole will be made by the garage total length of tunnel is 60 feet. sewer line will be replaced from the home to the city tap connection on the front left corner of the property total length of sewer line is approximately 55 feet · 104 m away
- 3910 Greystone DrJul 8, 2025Replacement of an existing water heater replace 50 gal nat gas water heater · 108 m away
- 7508 Chimney CornersAug 14, 2024Side beam penetration for 10 tunnel below the foundation to repair break below master bathroom on drain line and 40 tunnel thru side beam penetration to repair multiple breaks below hall bathroom and expose/support main line between hall and master · 110 m away
- 7631 Rockpoint DrNov 14, 2025We are working on a 36ft tunnel to remove a 4 pvc cross fitting and replacing with 4 pvc wye fittings for bathrooms · 126 m away
- 7405 Chimney CornersAug 6, 2025Express: installation of 24 gauge standing seam metal roof (non structural and not going past decking) · 128 m away
- 3911 Greystone DrDec 5, 2024105 tunnel below the foundation to replace entire cast-iron drain system. 4 access holes - 1 on each side. 56 trench to replace yard sewer line · 131 m away