7503 Chimney Corners
Austin, TX 78731
Electrical service repairs permitted at 7503 Chimney Corners
An electrical permit indicates repairs to the service at this residence, including replacing rusted conduit, the meter base and grounding. The City of Austin issued permit 2025-123538 EP on October 2, 2025; its status is Final.
Summarized from City of Austin records · updated Oct 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 2, 2025
- since Oct 2, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledDig up ridged conduit because its rusted through and showing wire. replacing meter base and grounding service
- AppliedSep 29, 2025
- IssuedOct 2, 2025
- WorkOct '25 – Dec '25
- Final inspectionDec 2, 2025
Passed final inspection Dec 2, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectDig up ridged conduit because its rusted through and showing wire. replacing meter base and grounding service
Dig up ridged conduit because its rusted through and showing wire. replacing meter base and grounding service
City of Austin permitElectrical PermitFinal- Record
- 2025-123538 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7503 Chimney Corners
What is happening at 7503 Chimney Corners?
A City of Austin electrical permit indicates repairs to rusted conduit and replacement of the meter base and grounding service. Permit 2025-123538 EP was issued October 2, 2025.
Is a new building being built at 7503 Chimney Corners?
The record is for electrical service repairs, not a new building. The permit is listed as Final.
When was the electrical work at 7503 Chimney Corners permitted?
The City of Austin issued electrical permit 2025-123538 EP on October 2, 2025.
What does permit 2025-123538 EP cover?
The permit description says rusted conduit showing wire will be dug up, and the meter base and grounding service will be replaced.
Is the permit for 7503 Chimney Corners final?
Yes. The City of Austin lists permit 2025-123538 EP as Final.
Also being built nearby
All of 78731- 7505 Chimney CornersOct 16, 2026Construct new driveway approach of 11.65 ft. no sidewalk inspection per plan review · 24 m away
- 7504 Chimney CornersApr 22, 2026Upgrade service · 47 m away
- 7502 Stonecliff DrMay 15, 2026Remodel existing deck around pool reinforced and remodel (remove top of deck and redo steel that is holding it up to make structurally sound) · 67 m away
- 3903 Edgerock DrMar 25, 2026Replacement of complete existing central heat and air system with or without duct work replace existing 4-ton vertical gas split system with new 4-ton air conditioner two-stage 90 k btu variable-speed gas furnace and new thermostat; no structural change · 76 m away
- 7405 Chimney CornersAug 6, 2025Express: installation of 24 gauge standing seam metal roof (non structural and not going past decking) · 92 m away
- 3904 Edgerock DrOct 27, 2025Installation of 5.85kw solar pv system with battery backup · 116 m away
- 7403 Chimney CornersNov 21, 2024Changeout water heater to exting resid only · 127 m away
- 7508 Chimney CornersAug 14, 2024Side beam penetration for 10 tunnel below the foundation to repair break below master bathroom on drain line and 40 tunnel thru side beam penetration to repair multiple breaks below hall bathroom and expose/support main line between hall and master · 129 m away
- 3806 Greystone DrMar 16, 2026Full interior renovation of existing single-family home with structural changes. replacement of all fixtures and finishes · 130 m away
- 3906 Edgerock DrMay 13, 2025*partial demolition* new uncovered wood deck and pergola for single-story sfr · 135 m away
- 3809 Hidden HolwMay 22, 2025Replacement of complete existing central heat and air system with or without duct work · 137 m away
- 3907 Greystone DrMar 25, 2026Tunnel under foundation to replace cast iron for 2 full bathrooms and half bathroom with kitchen and washer drain. will have 3 access holes one where drain line exits the foundation the second where bathroom is located on the the far right side of the home and the third access hole will be made by the garage total length of tunnel is 60 feet. sewer line will be replaced from the home to the city tap connection on the front left corner of the property total length of sewer line is approximately 55 feet · 140 m away