1807 Cedar Ridge Dr
Austin, TX 78741
1807 Cedar Ridge Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 1807 Cedar Ridge Dr, Austin, TX 78741. The most recent, filed April 24, 2025, covers: “20ft tunnel to repair broken cast iron drains under home”.
Compiled from City of Austin records · updated Apr 24, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 24, 2025
- since Apr 24, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled20ft tunnel to repair broken cast iron drains under home
- AppliedApr 21, 2025
- IssuedApr 24, 2025
- WorkApr '25 – May '25
- Final inspectionMay 29, 2025
Passed final inspection May 29, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 project20ft tunnel to repair broken cast iron drains under home
20ft tunnel to repair broken cast iron drains under home
City of Austin permitPlumbing PermitFinal- Record
- 2025-048709 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1807 Cedar Ridge Dr
What is being built at 1807 Cedar Ridge Dr?
The latest filing (City of Austin permit 2025-048709 PP, April 24, 2025) covers 20ft tunnel to repair broken cast iron drains under home.
How many permits and filings does 1807 Cedar Ridge Dr have?
1 filing across 1 project, from April 24, 2025 to April 24, 2025.
Is there other construction near 1807 Cedar Ridge Dr?
Yes. Nearby filings include 1809 Cedar Ridge Dr (express - existing foundation repair as per scope of work attached, May 5, 2026); 1804 Cedar Ridge Dr (replacement of an existing water heater, Mar 10, 2026); 1812 Crooked Ln (upgrade existing 100amp underground service with no main to a new 200amp with new equipment, May 30, 2025).
How do I get alerts for new permits at 1807 Cedar Ridge Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78741- 1809 Cedar Ridge DrMay 5, 2026Express - existing foundation repair as per scope of work attached · 25 m away
- 1804 Cedar Ridge DrMar 10, 2026Replacement of an existing water heater · 42 m away
- 1812 Crooked LnMay 30, 2025Upgrade existing 100amp underground service with no main to a new 200amp with new equipment · 57 m away
- 1813 Cedar Ridge DrOct 7, 2026Express: nonstructural interior demolition remove sheetrock for exploratory purposes · 71 m away
- 1809 Woodland AveJan 12, 2024Tunnel below the foundation to repair drain lines and trench thru yard to repair sewer line · 81 m away
- 1809 Parker LnJan 25, 2024Construct new driveway approach of 12 ft. no sidewalk inspection per plan review · 100 m away
- 1811 Parker LnNov 26, 2024New construction single family residential 2-story 3-bedroom 2.5 bath with attached 2-car garage covered front porch and habitable attic with balcony · 101 m away
- 1813 Crooked LnJan 26, 2024Request to disconnect contractor temporarily disconnect required to add battery storage. we are not upgrading the size of the service not upgrading the meter size · 102 m away
- 1812 Cedar Ridge DrSep 14, 2026Replace old outdated overhead service and meter can with new meter enclosure. 200a disconnect which feeds main panel approximately 10ft away. will bring everything up to relevant codes · 110 m away
- 1813 Parker LnJun 30, 2025House is unoccupied and the two ac & heating systems will need to be replaced. there is no duct work · 110 m away
- 1815 Parker LnDec 14, 2023Install power for electric car · 122 m away
- 1900 Cedar Ridge DrOct 17, 2025Replacement of an existing water heater · 126 m away