1809 Woodland Ave
Austin, TX 78741
1809 Woodland Ave: 2 projects on record
City of Austin lists 2 filings across 2 projects at 1809 Woodland Ave, Austin, TX 78741. The most recent, filed January 12, 2024, covers: “Tunnel below the foundation to repair drain lines and trench thru yard to repair sewer line”.
Compiled from City of Austin records · updated Jan 12, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Jan 12, 2024
- since Jan 12, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel below the foundation to repair drain lines and trench thru yard to repair sewer line
- AppliedDec 12, 2023
- IssuedJan 12, 2024
- WorkJan '24 – Feb '24
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsTunnel below the foundation to repair drain lines and trench thru yard to repair sewer line
Tunnel below the foundation to repair drain lines and trench thru yard to repair sewer line
City of Austin permitPlumbing PermitFinal- Record
- 2023-158327 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-138696 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1809 Woodland Ave
What is being built at 1809 Woodland Ave?
The latest filing (City of Austin permit 2023-158327 PP, January 12, 2024) covers tunnel below the foundation to repair drain lines and trench thru yard to repair sewer line.
How many permits and filings does 1809 Woodland Ave have?
2 filings across 2 projects, from January 12, 2024 to January 12, 2024.
Is there other construction near 1809 Woodland Ave?
Yes. Nearby filings include 1806 Woodland Ave (new swimming pool (450 sq ft) and concrete decking (409 sq ft) - coping (102 sq ft), Nov 16, 2023); 1807 Cedar Ridge Dr (20ft tunnel to repair broken cast iron drains under home, Apr 24, 2025); 1804 Woodland Ave (remove tank type water heater and install a tankless water heater, Apr 21, 2025).
How do I get alerts for new permits at 1809 Woodland Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78741- 1806 Woodland AveNov 16, 2023New swimming pool (450 sq ft) and concrete decking (409 sq ft) - coping (102 sq ft) · 63 m away
- 1807 Cedar Ridge DrApr 24, 202520ft tunnel to repair broken cast iron drains under home · 81 m away
- 1804 Woodland AveApr 21, 2025Remove tank type water heater and install a tankless water heater · 82 m away
- 1804 Cedar Ridge DrMar 10, 2026Replacement of an existing water heater · 85 m away
- 1900 Woodland AveApr 30, 2026Tunnel under foundation at the front left of home near the stairs. replace approximately 15ft of the main sewer line. will not be breaking into the foundation · 86 m away
- 1809 Cedar Ridge DrMay 5, 2026Express - existing foundation repair as per scope of work attached · 106 m away
- 1812 Crooked LnMay 30, 2025Upgrade existing 100amp underground service with no main to a new 200amp with new equipment · 128 m away
- 1809 Parker LnJan 25, 2024Construct new driveway approach of 12 ft. no sidewalk inspection per plan review · 132 m away
- 1910 Crooked LnFeb 5, 2026Install new irrigation · 140 m away
- 1811 Parker LnNov 26, 2024New construction single family residential 2-story 3-bedroom 2.5 bath with attached 2-car garage covered front porch and habitable attic with balcony · 141 m away
- 1633 Royal Crest DrFeb 13, 2024Siding replacements on existing structure for multi-family building. property is older than 45 years so historic will be opened for review · 142 m away
- 1616 Royal Crest DrJul 13, 2026Tunnel from the breezeway to access the broken sewer line and install new section of sewer line under building 5 · 142 m away