1809 Cedar Ridge Dr
Austin, TX 78741
Foundation and drain repairs permitted at 1809 Cedar Ridge Dr
Austin permits indicate foundation and main-drain repair work at 1809 Cedar Ridge Dr, rather than a new building. A plumbing permit filed September 19, 2025, covered excavation for a tunnel to repair the main drain line and is marked expired; a building permit filed May 5, 2026, covers repair of the existing foundation.
Summarized from City of Austin records · updated May 5, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 5, 2026
- since Sep 19, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress - existing foundation repair as per scope of work attached
- AppliedMay 4, 2026
- IssuedMay 5, 2026
- WorkMay '26 – Aug '26
- Final inspectionAug 19, 2026
Passed final inspection Aug 19, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
2 projectsExpress - existing foundation repair as per scope of work attached
Express - existing foundation repair as per scope of work attached
City of Austin permitBuilding PermitFinal- Record
- 2026-055397 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Excavate 3 tunnel to repair main drain line
Excavate 3 tunnel to repair main drain line
City of Austin permitPlumbing PermitExpired- Record
- 2025-118370 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1809 Cedar Ridge Dr
What work is permitted at 1809 Cedar Ridge Dr?
Austin permit records list repair of the existing foundation and work to repair the main drain line. They do not describe a new building.
Is a new house being built at 1809 Cedar Ridge Dr?
The records provided do not show a new-house permit. They list foundation repair and a plumbing permit for tunnel excavation to repair the main drain.
When was the foundation repair permit filed at 1809 Cedar Ridge Dr?
The building permit, 2026-055397 BP, was filed May 5, 2026. Its description says the work is to repair the existing foundation.
What does permit 2025-118370 PP cover?
The plumbing permit filed September 19, 2025, covers excavation for a tunnel to repair the main drain line. The permit is marked expired.
Are the permits at 1809 Cedar Ridge Dr for the same work?
The records list separate scopes: a tunnel excavation to repair the main drain and repair of the existing foundation. They do not provide further details connecting the work.
Also being built nearby
All of 78741- 1807 Cedar Ridge DrApr 24, 202520ft tunnel to repair broken cast iron drains under home · 25 m away
- 1812 Crooked LnMay 30, 2025Upgrade existing 100amp underground service with no main to a new 200amp with new equipment · 45 m away
- 1813 Cedar Ridge DrOct 7, 2026Express: nonstructural interior demolition remove sheetrock for exploratory purposes · 46 m away
- 1804 Cedar Ridge DrMar 10, 2026Replacement of an existing water heater · 52 m away
- 1812 Cedar Ridge DrSep 14, 2026Replace old outdated overhead service and meter can with new meter enclosure. 200a disconnect which feeds main panel approximately 10ft away. will bring everything up to relevant codes · 86 m away
- 1813 Crooked LnJan 26, 2024Request to disconnect contractor temporarily disconnect required to add battery storage. we are not upgrading the size of the service not upgrading the meter size · 96 m away
- 1811 Parker LnNov 26, 2024New construction single family residential 2-story 3-bedroom 2.5 bath with attached 2-car garage covered front porch and habitable attic with balcony · 98 m away
- 1809 Parker LnJan 25, 2024Construct new driveway approach of 12 ft. no sidewalk inspection per plan review · 100 m away
- 1900 Cedar Ridge DrOct 17, 2025Replacement of an existing water heater · 101 m away
- 1813 Parker LnJun 30, 2025House is unoccupied and the two ac & heating systems will need to be replaced. there is no duct work · 102 m away
- 1809 Woodland AveJan 12, 2024Tunnel below the foundation to repair drain lines and trench thru yard to repair sewer line · 106 m away
- 1815 Parker LnDec 14, 2023Install power for electric car · 108 m away