Plumbing repairs and a new driveway approach at 3002 Matador Dr
Austin permits cover water-line work outside the home, a new driveway approach, and replacement of about 60 feet of sewer yard line. The water-line permits were filed November 18, 2025, the driveway permit was dated April 11, 2025, and the sewer-line permit was filed June 9, 2026.
Summarized from City of Austin records · updated Jun 9, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Jun 9, 2026
- since Apr 11, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacing approximately 60ft of main sewer yard line between homeowner side of tap and the home. nothing inside or under the home will be replaced
- AppliedJun 2, 2026
- IssuedJun 9, 2026
- WorkJun '26 – Nov '26
- Final inspectionNov 10, 2026
Passed final inspection Nov 10, 2026.
1 contact on this project · 1 phone number
Permit & project history
4 projectsReplacing approximately 60ft of main sewer yard line between homeowner side of tap and the home. nothing inside or under the home will be replaced
Replacing approximately 60ft of main sewer yard line between homeowner side of tap and the home. nothing inside or under the home will be replaced
City of Austin permitPlumbing PermitFinal- Record
- 2026-069736 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Excavate to 70ft of water line from home towards meter all outside. this is being done to both side a & b. 2 permits and inspections will be done. both lines are going into the same trench
Excavate to 70ft of water line from home towards meter all outside. this is being done to both side a & b. 2 permits and inspections will be done. both lines are going into the same trench
City of Austin permitPlumbing PermitFinal- Record
- 2025-147282 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Excavate to 70ft of water line from home towards meter all outside. this is being done to both side a & b. 2 permits and inspections will be done. both lines are going into the same trench
Excavate to 70ft of water line from home towards meter all outside. this is being done to both side a & b. 2 permits and inspections will be done. both lines are going into the same trench
City of Austin permitPlumbing PermitFinal- Record
- 2025-147285 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Construct new driveway approach of 24 ft
Construct new driveway approach of 24 ft
City of Austin permitDriveway / SidewalksFinal- Record
- 2024-107524 DS
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3002 Matador Dr
What work is permitted at 3002 Matador Dr?
City of Austin permits cover exterior water-line work, a 24-foot driveway approach, and replacement of about 60 feet of sewer yard line. They do not describe construction of a new building.
Is a new home being built at 3002 Matador Dr?
The records provided describe plumbing work and a driveway approach, not a new home. The sewer-line permit says no work inside or under the home is planned.
When were the plumbing permits filed for 3002 Matador Dr?
Two water-line permits, 2025-147282 PP and 2025-147285 PP, were filed November 18, 2025. The sewer yard line permit, 2026-069736 PP, was filed June 9, 2026.
What plumbing work is planned at 3002 Matador Dr?
The permits describe excavating up to 70 feet of water line from the home toward the meter on both sides, with both lines using the same trench. A separate permit covers replacing about 60 feet of sewer yard line between the tap and the home.
Is there a driveway permit for 3002 Matador Dr?
Yes. Permit 2024-107524 DS, dated April 11, 2025, covers construction of a new 24-foot driveway approach.
Also being built nearby
All of 78741- 3000 Matador DrDec 21, 2023Replace tankless water heater · 22 m away
- 2211 Metcalfe RdOct 30, 2024Tunnel under foundatoin from the outside to expose drain lines for both a and b unit that includes 2 bathrooms 2 kitchen drains and a walsher drain a total length of 80 feet. sewer line replacement from the home to the street that is a total of 25 feet · 42 m away
- 2214 Metcalfe RdJan 12, 2026Repair drainpipes by tunneling. there will be 15 linear feet of tunneling to repair the drain lines under the bathrooms. there will be an access hole in the backyard. the drain lines for the kitchen and laundry room will also be replaced. those lines will be run outside the house rather than through tunneling · 69 m away
- 3007 Matador DrFeb 28, 2024Replace sewer line from home to city tap connection · 78 m away
- 3009 Matador DrSep 15, 2026Construct new driveway approach of 16 ft and curb & gutter of 26 ft · 97 m away
- 2204 Bahia CirSep 14, 2026Total demolition of 2000 sq ft sfr circa 1971 · 98 m away
- 3006 Catalina DrJun 1, 2026Upgrade main service to 125amp · 99 m away
- 3100 Catalina DrSep 29, 2026Express- install 38 hybrid steel piers to lift and stabilize the foundation · 114 m away
- 3011 Matador DrApr 14, 2026Express: foundation repair · 114 m away
- 3102 Catalina DrNov 3, 2025Express - foundation repair · 128 m away
- 3002 Burleson RdNov 9, 2026Dig up existing private yard line and move over approxantly 15 · 134 m away
- 3004 Burleson RdDec 26, 202485 tunnel below the foundation to replace cast-iron drain system. 3 access holes -1 front 1 back 1 left · 135 m away