3004 Burleson Rd
Austin, TX 78741
3004 Burleson Rd: 2 projects on record
City of Austin lists 2 filings across 2 projects at 3004 Burleson Rd, Austin, TX 78741 since May 15, 2024. The most recent, filed December 26, 2024, covers: “85 tunnel below the foundation to replace cast-iron drain system. 3 access holes -1 front 1 back 1 left”.
Compiled from City of Austin records · updated Dec 26, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Dec 26, 2024
- since May 15, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled85 tunnel below the foundation to replace cast-iron drain system. 3 access holes -1 front 1 back 1 left
- AppliedDec 11, 2024
- IssuedDec 26, 2024
- WorkDec '24 – Jan '25
- Final inspectionJan 24, 2025
Passed final inspection Jan 24, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projects85 tunnel below the foundation to replace cast-iron drain system. 3 access holes -1 front 1 back 1 left
85 tunnel below the foundation to replace cast-iron drain system. 3 access holes -1 front 1 back 1 left
City of Austin permitPlumbing PermitFinal- Record
- 2024-161968 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Request to disconnect rebuild duplex overhead service
Request to disconnect rebuild duplex overhead service
City of Austin permitElectrical PermitFinal- Record
- 2024-059164 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3004 Burleson Rd
What is being built at 3004 Burleson Rd?
The latest filing (City of Austin permit 2024-161968 PP, December 26, 2024) covers 85 tunnel below the foundation to replace cast-iron drain system. 3 access holes -1 front 1 back 1 left.
How many permits and filings does 3004 Burleson Rd have?
2 filings across 2 projects, from May 15, 2024 to December 26, 2024.
Is there other construction near 3004 Burleson Rd?
Yes. Nearby filings include 3002 Burleson Rd (dig up existing private yard line and move over approxantly 15, Nov 9, 2026); 3006 Burleson Rd (express: installing 22 steel hybrid piers 3 exterior breakouts and 6 interior breakouts, Oct 6, 2026); 2905 Burleson Rd (polvado subdivision no. 2, amended plat of lots 1 & 2 of the amended plat of lot — polvado subdivision no. 3, lots 1 & 2 amended plat of amended plat of lots 3 and 4,polvado subdivision no.2, Feb 6, 2009).
How do I get alerts for new permits at 3004 Burleson Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78741- 3002 Burleson RdNov 9, 2026Dig up existing private yard line and move over approxantly 15 · 3 m away
- 3006 Burleson RdOct 6, 2026Express: installing 22 steel hybrid piers 3 exterior breakouts and 6 interior breakouts · 3 m away
- 2905 Burleson RdFeb 6, 2009Polvado subdivision no. 2, amended plat of lots 1 & 2 of the amended plat of lot — polvado subdivision no. 3, lots 1 & 2 amended plat of amended plat of lots 3 and 4,polvado subdivision no.2 · 60 m away
- 3007 Matador DrFeb 28, 2024Replace sewer line from home to city tap connection · 75 m away
- 3009 Matador DrSep 15, 2026Construct new driveway approach of 16 ft and curb & gutter of 26 ft · 83 m away
- 3011 Matador DrApr 14, 2026Express: foundation repair · 90 m away
- 2804 Ware RdSep 17, 2026Express: foundation repair revision 1: add pp · 96 m away
- 3013 Matador DrApr 27, 2024Electric service rebuild for 2 family unit 250 amp total · 105 m away
- 3000 Matador DrDec 21, 2023Replace tankless water heater · 134 m away
- 3002 Matador DrJun 9, 2026Replacing approximately 60ft of main sewer yard line between homeowner side of tap and the home. nothing inside or under the home will be replaced · 135 m away
- 2214 Metcalfe RdJan 12, 2026Repair drainpipes by tunneling. there will be 15 linear feet of tunneling to repair the drain lines under the bathrooms. there will be an access hole in the backyard. the drain lines for the kitchen and laundry room will also be replaced. those lines will be run outside the house rather than through tunneling · 143 m away
- 2800 Burleson RdJul 30, 2026To replace all dwv under slab with new schedule 40 pvc pipe and fitting by means of a tunnel approximately 90ft in length · 151 m away
More townhomes in 78741.