3007 Matador Dr
Austin, TX 78741
3007 Matador Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 3007 Matador Dr, Austin, TX 78741. The most recent, filed February 28, 2024, covers: “Replace sewer line from home to city tap connection”.
Compiled from City of Austin records · updated Feb 28, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 28, 2024
- since Feb 28, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace sewer line from home to city tap connection
- AppliedFeb 26, 2024
- IssuedFeb 28, 2024
- WorkFeb '24 – Mar '24
- Final inspectionMar 5, 2024
Passed final inspection Mar 5, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace sewer line from home to city tap connection
Replace sewer line from home to city tap connection
City of Austin permitPlumbing PermitFinal- Record
- 2024-023891 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3007 Matador Dr
What is being built at 3007 Matador Dr?
The latest filing (City of Austin permit 2024-023891 PP, February 28, 2024) covers replace sewer line from home to city tap connection.
How many permits and filings does 3007 Matador Dr have?
1 filing across 1 project, from February 28, 2024 to February 28, 2024.
Is there other construction near 3007 Matador Dr?
Yes. Nearby filings include 3009 Matador Dr (construct new driveway approach of 16 ft and curb & gutter of 26 ft, Sep 15, 2026); 3011 Matador Dr (express: foundation repair, Apr 14, 2026); 3013 Matador Dr (electric service rebuild for 2 family unit 250 amp total, Apr 27, 2024).
How do I get alerts for new permits at 3007 Matador Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78741- 3009 Matador DrSep 15, 2026Construct new driveway approach of 16 ft and curb & gutter of 26 ft · 24 m away
- 3011 Matador DrApr 14, 2026Express: foundation repair · 43 m away
- 3013 Matador DrApr 27, 2024Electric service rebuild for 2 family unit 250 amp total · 68 m away
- 3006 Burleson RdOct 6, 2026Express: installing 22 steel hybrid piers 3 exterior breakouts and 6 interior breakouts · 75 m away
- 3004 Burleson RdDec 26, 202485 tunnel below the foundation to replace cast-iron drain system. 3 access holes -1 front 1 back 1 left · 75 m away
- 3002 Burleson RdNov 9, 2026Dig up existing private yard line and move over approxantly 15 · 75 m away
- 3002 Matador DrJun 9, 2026Replacing approximately 60ft of main sewer yard line between homeowner side of tap and the home. nothing inside or under the home will be replaced · 78 m away
- 3000 Matador DrDec 21, 2023Replace tankless water heater · 88 m away
- 2204 Bahia CirSep 14, 2026Total demolition of 2000 sq ft sfr circa 1971 · 105 m away
- 2211 Metcalfe RdOct 30, 2024Tunnel under foundatoin from the outside to expose drain lines for both a and b unit that includes 2 bathrooms 2 kitchen drains and a walsher drain a total length of 80 feet. sewer line replacement from the home to the street that is a total of 25 feet · 118 m away
- 2214 Metcalfe RdJan 12, 2026Repair drainpipes by tunneling. there will be 15 linear feet of tunneling to repair the drain lines under the bathrooms. there will be an access hole in the backyard. the drain lines for the kitchen and laundry room will also be replaced. those lines will be run outside the house rather than through tunneling · 120 m away
- 2905 Burleson RdFeb 6, 2009Polvado subdivision no. 2, amended plat of lots 1 & 2 of the amended plat of lot — polvado subdivision no. 3, lots 1 & 2 amended plat of amended plat of lots 3 and 4,polvado subdivision no.2 · 124 m away