200-amp electrical panel replacement at 5201 Bonneville Bnd
A 200-amp electrical panel replacement is listed for 5201 Bonneville Bnd in Austin. City of Austin permit 2026-071900 EP was filed June 11, 2026, and is marked Final; the description notes disconnect and reconnect work only.
Summarized from City of Austin records · updated Jun 11, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 11, 2026
- since Jun 11, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEtj - 200amp panel replacement *has ae- disconnect and reconnect only
- AppliedJun 5, 2026
- IssuedJun 11, 2026
- WorkJun '26 – Jun '26
- Final inspectionJun 22, 2026
Passed final inspection Jun 22, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectEtj - 200amp panel replacement *has ae- disconnect and reconnect only
Etj - 200amp panel replacement *has ae- disconnect and reconnect only
City of Austin permitElectrical PermitFinal- Record
- 2026-071900 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5201 Bonneville Bnd
What work is happening at 5201 Bonneville Bnd?
A City of Austin electrical permit lists a 200-amp panel replacement, with disconnect and reconnect work only.
When was the electrical permit filed for 5201 Bonneville Bnd?
Permit 2026-071900 EP was filed June 11, 2026.
Is the permit for 5201 Bonneville Bnd final?
Yes. The City of Austin record lists permit 2026-071900 EP as Final.
Is a new building being built at 5201 Bonneville Bnd?
The available record is for an electrical panel replacement, not a new building.
What is happening near Balcones Re Addison 2022?
At 5201 Bonneville Bnd, about 484 meters from Balcones Re Addison 2022, a City of Austin permit lists a 200-amp panel replacement.
Also being built nearby
All of 78744- 5124 Bonneville BndJan 3, 2025Disconnect/reconnect to tie in installation of an 882kw pv system · 58 m away
- 5216 Bonneville BndMar 4, 2024***emergency*** replace main breaker (200 amp) · 66 m away
- 5305 Bonneville BndAug 16, 2024Install an embr two pole 60 amp breaker and run approximately 140 foot of surface mount of conduit with miscellaneous 90s lbs benz and bell boxes as needed around the entire back of the home to the garage location punch in the wall with an lb and install a customer provided tesla wall connector · 105 m away
- 5017 Ingersoll LnApr 11, 2024***new solar panels on new solar system*** installation of solar panels on existing residential roof. 5.2 kw · 116 m away
- 5317 Bonneville BndApr 4, 2024Request to disconnect. upgrade meter socket · 151 m away
- 5405 Daimler DrFeb 11, 2026Kinsey will tunnel under home following main sewer line in yard at cleanout under garage approx 10ft of tunnel. we will remove broken pvc pipe under garage and install new sched 40 pvc in its place. bed outside trench approx 5 ft in sand and hang pipe from slab every 6 ft. engineer report will be sent to city once tunnel is finished being exposed · 169 m away
- 5012 Bonneville BndAug 5, 2026Replacement of an existing water heater 50 gallon nat gas water heater replacement · 180 m away
- 7909 Izetta LnSep 20, 2024Disconnect/reconnect power to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size · 225 m away
- 5000 Bonneville BndSep 4, 2026Base: installing a backup battery system and additional meter socket · 232 m away
- 8012 Annalise DrOct 17, 2024Install tankless replace prv and install halo · 274 m away
- 8001 Industry WayOct 29, 2019Park 183 building 5 · 401 m away
- 8201 Annalise DrOct 5, 2026Install new 200a panel and make the existing main panel a sub panel. no increase to amperage or load. approved espa attached. will need disconnect/reconnect. etj · 439 m away