5405 Daimler Dr
Austin, TX 78744
Sewer line repair permitted at 5405 Daimler Dr
A sewer-line repair at 5405 Daimler Dr will replace broken PVC pipe beneath the garage. The City of Austin issued plumbing permit 2026-015095 PP on February 11, 2026; the permit is marked Final.
Summarized from City of Austin records · updated Feb 11, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 11, 2026
- since Feb 11, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledKinsey will tunnel under home following main sewer line in yard at cleanout under garage approx 10ft of tunnel. we will remove broken pvc pipe under garage and install new sched 40 pvc in its place. bed outside trench approx 5 ft in sand and hang pipe from slab every 6 ft. engineer report will be sent to city once tunnel is finished being exposed
- AppliedFeb 9, 2026
- IssuedFeb 11, 2026
- WorkFeb '26 – Mar '26
- Final inspectionMar 10, 2026
Passed final inspection Mar 10, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectKinsey will tunnel under home following main sewer line in yard at cleanout under garage approx 10ft of tunnel. we will remove broken pvc pipe under garage and install new sched 40 pvc in its place. bed outside trench approx 5 ft in sand and hang pipe from slab every 6 ft. engineer report will be sent to city once tunnel is finished being exposed
Kinsey will tunnel under home following main sewer line in yard at cleanout under garage approx 10ft of tunnel. we will remove broken pvc pipe under garage and install new sched 40 pvc in its place. bed outside trench approx 5 ft in sand and hang pipe from slab every 6 ft. engineer report will be sent to city once tunnel is finished being exposed
City of Austin permitPlumbing PermitFinal- Record
- 2026-015095 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5405 Daimler Dr
What work is happening at 5405 Daimler Dr?
A plumbing permit describes tunneling beneath the home to replace broken PVC pipe under the garage and repair the sewer line. Permit 2026-015095 PP was issued February 11, 2026.
When was the sewer repair at 5405 Daimler Dr permitted?
The City of Austin permit is dated February 11, 2026. The permit number is 2026-015095 PP.
Is a new home being built at 5405 Daimler Dr?
The record is for a plumbing repair, not a new home. It describes replacing broken PVC pipe beneath the garage.
What kind of permit was issued for 5405 Daimler Dr?
The City of Austin issued a plumbing permit, number 2026-015095 PP, for sewer-line work. Its status is listed as Final.
What work is happening near Balcones Re Addison 2022?
A sewer-line repair was permitted at 5405 Daimler Dr, about 372 meters from Balcones Re Addison 2022. The permit describes replacing broken PVC pipe beneath the garage.
Also being built nearby
All of 78744- 5317 Bonneville BndApr 4, 2024Request to disconnect. upgrade meter socket · 93 m away
- 7909 Izetta LnSep 20, 2024Disconnect/reconnect power to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size · 102 m away
- 5305 Bonneville BndAug 16, 2024Install an embr two pole 60 amp breaker and run approximately 140 foot of surface mount of conduit with miscellaneous 90s lbs benz and bell boxes as needed around the entire back of the home to the garage location punch in the wall with an lb and install a customer provided tesla wall connector · 105 m away
- 8012 Annalise DrOct 17, 2024Install tankless replace prv and install halo · 107 m away
- 5017 Ingersoll LnApr 11, 2024***new solar panels on new solar system*** installation of solar panels on existing residential roof. 5.2 kw · 138 m away
- 5201 Bonneville BndJun 11, 2026Etj - 200amp panel replacement *has ae- disconnect and reconnect only · 169 m away
- 5216 Bonneville BndMar 4, 2024***emergency*** replace main breaker (200 amp) · 192 m away
- 5124 Bonneville BndJan 3, 2025Disconnect/reconnect to tie in installation of an 882kw pv system · 225 m away
- 5012 Bonneville BndAug 5, 2026Replacement of an existing water heater 50 gallon nat gas water heater replacement · 239 m away
- 5000 Bonneville BndSep 4, 2026Base: installing a backup battery system and additional meter socket · 264 m away
- 8201 Annalise DrOct 5, 2026Install new 200a panel and make the existing main panel a sub panel. no increase to amperage or load. approved espa attached. will need disconnect/reconnect. etj · 297 m away
- 5608 Bonneville BndSep 11, 2024Replacement of an existing water heater · 327 m away