7701-1/2 Ausblick Ave
Austin, TX 78744
Easton Park Section 2C Phase 4 construction plan approved
A construction plan for Easton Park Section 2C Phase 4 at 7701-1/2 Ausblick Ave was approved and released on August 25, 2026. The City of Austin case is listed as a subdivision plan, case 13060199.
Summarized from City of Austin records · updated Aug 25, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 25, 2026
- since Aug 25, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 7701-1/2 Ausblick Ave
What is being built at 7701-1/2 Ausblick Ave?
A construction plan for Easton Park Section 2C Phase 4 is listed at this address. The City of Austin approved and released the plan on August 25, 2026.
What is the Easton Park Section 2C Phase 4 project?
It is a subdivision construction plan filed with the City of Austin. The case is numbered 13060199.
When was the construction plan for 7701-1/2 Ausblick Ave approved?
The City of Austin case was approved and released on August 25, 2026.
Is this a commercial building project?
The record identifies the project as a subdivision construction plan, not a commercial building permit.
What is planned near Easton Park South - Section 7?
A construction plan for Easton Park Section 2C Phase 4 is listed at 7701-1/2 Ausblick Ave, about 376 meters from Easton Park South - Section 7 at 8009 Sassman Rd.
What is the City of Austin case number for this project?
The case number is 13060199. It was approved and released on August 25, 2026.
Also being built nearby
All of 78744- 8001 Bristly Locust DrSep 29, 2024Easton park phase 4b east phase 2 construction plans · 14 m away
- 7918 Corrigan PassDec 18, 2025Express- remove and replace 6 windows · 196 m away
- 7913 Corrigan PassAug 14, 2024Repair belly on sewer line · 201 m away
- 8009 Corrigan PassJan 13, 2026New construction in-ground pool with concrete deck · 282 m away
- 8018 Corrigan PassApr 11, 2024Installation of 59 roof mounted solar panels a line side tap will be completed on the existing main service panel. equipment includes 59x hanwha qcell 410 solar edge inverter 11400 solar edge inverter 6000 tesla backup gateway · 290 m away
- 8807 Bestride BndMay 15, 2026(sepulveda joe treehouse) - installation of circuit for elec. vehicle charging station - esip · 321 m away
- 8209 Hubble WalkMar 18, 2024Addition of an expanded covered patio with outdoor kitchen to rear of existing 1-story sfr · 329 m away
- 8002 Sassman RdSep 10, 2022Easton park south section 6 · 332 m away
- 8200 Hubble WalkJan 28, 2025Ev install · 342 m away
- 7809 Orizzonte StNov 9, 2026Total demolition of pool 508 sq ft circa 2022 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 366 m away
- 9212 Spire VwAug 17, 2026New in-ground pool and spa with pool equipment composite material deck turf and required enclosure (heater or autofill) · 369 m away
- 9205 Spire VwApr 3, 2026Replacement of an existing tank type water heater. customer supplied water heater for change out · 383 m away