8001 Bristly Locust Dr
Austin, TX 78744
Easton Park Phase 4B East Phase 2 subdivision plans
Construction plans for the Easton Park Phase 4B East Phase 2 subdivision were filed with the City of Austin on September 29, 2024. The case is marked expired; the record does not specify a project size or construction timeline.
Summarized from City of Austin records · updated Sep 29, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 29, 2024
- since Sep 29, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 8001 Bristly Locust Dr
What is being planned at 8001 Bristly Locust Dr?
A City of Austin case lists construction plans for the Easton Park Phase 4B East Phase 2 subdivision. The case was filed September 29, 2024, and is marked expired.
Is construction underway at 8001 Bristly Locust Dr?
The available record is for subdivision construction plans, not a construction-start notice. The case status is expired.
When were the Easton Park Phase 4B East Phase 2 plans filed?
The City of Austin case was filed September 29, 2024. Its case number is 13374781.
What is the status of the Easton Park Phase 4B East Phase 2 case?
The City of Austin record lists the case as expired. It does not provide a construction timeline.
What is planned near Easton Park South - Section 7?
A nearby City of Austin case at 8001 Bristly Locust Dr lists Easton Park Phase 4B East Phase 2 subdivision construction plans. The case was filed September 29, 2024, and is marked expired.
Also being built nearby
All of 78744- 7701-1/2 Ausblick AveAug 25, 2026Easton park section 2c phase 4 construction plan · 14 m away
- 7918 Corrigan PassDec 18, 2025Express- remove and replace 6 windows · 193 m away
- 7913 Corrigan PassAug 14, 2024Repair belly on sewer line · 196 m away
- 8009 Corrigan PassJan 13, 2026New construction in-ground pool with concrete deck · 279 m away
- 8018 Corrigan PassApr 11, 2024Installation of 59 roof mounted solar panels a line side tap will be completed on the existing main service panel. equipment includes 59x hanwha qcell 410 solar edge inverter 11400 solar edge inverter 6000 tesla backup gateway · 288 m away
- 8209 Hubble WalkMar 18, 2024Addition of an expanded covered patio with outdoor kitchen to rear of existing 1-story sfr · 320 m away
- 8002 Sassman RdSep 10, 2022Easton park south section 6 · 325 m away
- 8807 Bestride BndMay 15, 2026(sepulveda joe treehouse) - installation of circuit for elec. vehicle charging station - esip · 327 m away
- 8200 Hubble WalkJan 28, 2025Ev install · 335 m away
- 9212 Spire VwAug 17, 2026New in-ground pool and spa with pool equipment composite material deck turf and required enclosure (heater or autofill) · 360 m away
- 9205 Spire VwApr 3, 2026Replacement of an existing tank type water heater. customer supplied water heater for change out · 374 m away
- 7809 Orizzonte StNov 9, 2026Total demolition of pool 508 sq ft circa 2022 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 377 m away