2304 Village Cir
Austin, TX 78745
2304 Village Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 2304 Village Cir, Austin, TX 78745. The most recent, filed May 13, 2025, covers: “Sewer line replacement”.
Compiled from City of Austin records · updated May 13, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 13, 2025
- since May 13, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledSewer line replacement
- AppliedMay 8, 2025
- IssuedMay 13, 2025
- WorkMay '25 – May '25
- Final inspectionMay 20, 2025
Passed final inspection May 20, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectSewer line replacement
Sewer line replacement
City of Austin permitPlumbing PermitFinal- Record
- 2025-057338 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2304 Village Cir
What is being built at 2304 Village Cir?
The latest filing (City of Austin permit 2025-057338 PP, May 13, 2025) covers sewer line replacement.
How many permits and filings does 2304 Village Cir have?
1 filing across 1 project, from May 13, 2025 to May 13, 2025.
Is there other construction near 2304 Village Cir?
Yes. Nearby filings include 2306 Village Cir (new irrigation system, Nov 27, 2023); 2307 Village Way Dr (express foundation repair, Feb 29, 2024); 2300 Village Cir (excavate roughly 80 feet under the foundation of the home to expose the cast iron sewer lines. cut out all exposed lines and replace using schedule 40 pvc. hang all new piper per code using clevis hangers, Aug 19, 2024).
How do I get alerts for new permits at 2304 Village Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 2306 Village CirNov 27, 2023New irrigation system · 25 m away
- 2307 Village Way DrFeb 29, 2024Express foundation repair · 45 m away
- 2300 Village CirAug 19, 2024Excavate roughly 80 feet under the foundation of the home to expose the cast iron sewer lines. cut out all exposed lines and replace using schedule 40 pvc. hang all new piper per code using clevis hangers · 53 m away
- 2317 Village CirApr 23, 2024Excavate roughly 80 feet from under the foundation of the home to expose all the cast iron sewer lines. once exposed remove all cast iron lines and replace using schedule 40 pvc hang new lines per code using clevis hangers · 69 m away
- 2303 Village CirAug 4, 2026Replacement of complete existing central heat and air system with or without duct work · 69 m away
- 2309 Village Way DrNov 5, 2024Interior remodel whole home remodel: replace cast-iron pipe; install new water lines tankless hot water heater and plumbing fixtures (reference 2024-077195 pp); replace electric panel/aluminum wiring install new outlets/switches/lighting: install new hvac system; remove wall and install beam; install 1 new window enlarge kitchen window replace remaining windows; install new doors flooring cabinetry doors and trim. rolling in expired permit 2018-175921 ep - replace 125 main panel only to residence · 72 m away
- 2310 Village CirAug 17, 2026Building#1: retroactively permit attached covered patio · 73 m away
- 2312 Village CirMay 6, 2025We will be upgrading from 100amp panel to 150amp panel · 88 m away
- 2321 Village CirAug 19, 2025Excavate roughly 65-70 feet from under the foundation of the home to expose and replace the sewer lines with schedule 40 pvc. hang all new pipe using clevis hangers. as well as trench out roughly 55 feet of the outside sewer yard line to the city tap and replace using schedule 40 pvc. bed in new line with sand · 95 m away
- 2304 Chasewych DrNov 6, 2026For both units on this property (residential duplex): replace existing main electrical service panels. install austin energy approved meter enclosures and 100 amp panels. the approved espa form is attached · 110 m away
- 2214 Village Way DrApr 6, 2024Install an irrigation system to permit address · 112 m away
- 5403 Fernview RdJul 14, 2025New attached pergola · 114 m away