groundranger
Historic · latest filing May 2025Residential

2312 Village Cir

Austin, TX 78745

2312 Village Cir: 1 project on record

City of Austin lists 1 filing across 1 project at 2312 Village Cir, Austin, TX 78745. The most recent, filed May 6, 2025, covers: “We will be upgrading from 100amp panel to 150amp panel”.

Compiled from City of Austin records · updated May 6, 2025

Projects
1
1 filings
Latest filing
May 6, 2025
since May 6, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

We will be upgrading from 100amp panel to 150amp panel

  1. AppliedApr 29, 2025
  2. IssuedMay 6, 2025
  3. WorkMay '25 – Jun '25
  4. Final inspectionJun 3, 2025

Passed final inspection Jun 3, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. We will be upgrading from 100amp panel to 150amp panel

    We will be upgrading from 100amp panel to 150amp panel

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2312 Village Cir

What is being built at 2312 Village Cir?

The latest filing (City of Austin permit 2025-052604 EP, May 6, 2025) covers we will be upgrading from 100amp panel to 150amp panel.

How many permits and filings does 2312 Village Cir have?

1 filing across 1 project, from May 6, 2025 to May 6, 2025.

Is there other construction near 2312 Village Cir?

Yes. Nearby filings include 2310 Village Cir (building#1: retroactively permit attached covered patio, Aug 17, 2026); 2309 Village Way Dr (interior remodel whole home remodel: replace cast-iron pipe; install new water lines tankless hot water heater and plumbing fixtures (reference 2024-077195 pp); replace electric panel/aluminum wiring install new outlets/switches/lighting: install new hvac system; remove wall and install beam; install 1 new window enlarge kitchen window replace remaining windows; install new doors flooring cabinetry doors and trim. rolling in expired permit 2018-175921 ep - replace 125 main panel only to residence, Nov 5, 2024); 2321 Village Cir (excavate roughly 65-70 feet from under the foundation of the home to expose and replace the sewer lines with schedule 40 pvc. hang all new pipe using clevis hangers. as well as trench out roughly 55 feet of the outside sewer yard line to the city tap and replace using schedule 40 pvc. bed in new line with sand, Aug 19, 2025).

How do I get alerts for new permits at 2312 Village Cir?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78745
Email me when a new permit is filed