2312 Village Cir
Austin, TX 78745
2312 Village Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 2312 Village Cir, Austin, TX 78745. The most recent, filed May 6, 2025, covers: “We will be upgrading from 100amp panel to 150amp panel”.
Compiled from City of Austin records · updated May 6, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 6, 2025
- since May 6, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledWe will be upgrading from 100amp panel to 150amp panel
- AppliedApr 29, 2025
- IssuedMay 6, 2025
- WorkMay '25 – Jun '25
- Final inspectionJun 3, 2025
Passed final inspection Jun 3, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectWe will be upgrading from 100amp panel to 150amp panel
We will be upgrading from 100amp panel to 150amp panel
City of Austin permitElectrical PermitFinal- Record
- 2025-052604 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2312 Village Cir
What is being built at 2312 Village Cir?
The latest filing (City of Austin permit 2025-052604 EP, May 6, 2025) covers we will be upgrading from 100amp panel to 150amp panel.
How many permits and filings does 2312 Village Cir have?
1 filing across 1 project, from May 6, 2025 to May 6, 2025.
Is there other construction near 2312 Village Cir?
Yes. Nearby filings include 2310 Village Cir (building#1: retroactively permit attached covered patio, Aug 17, 2026); 2309 Village Way Dr (interior remodel whole home remodel: replace cast-iron pipe; install new water lines tankless hot water heater and plumbing fixtures (reference 2024-077195 pp); replace electric panel/aluminum wiring install new outlets/switches/lighting: install new hvac system; remove wall and install beam; install 1 new window enlarge kitchen window replace remaining windows; install new doors flooring cabinetry doors and trim. rolling in expired permit 2018-175921 ep - replace 125 main panel only to residence, Nov 5, 2024); 2321 Village Cir (excavate roughly 65-70 feet from under the foundation of the home to expose and replace the sewer lines with schedule 40 pvc. hang all new pipe using clevis hangers. as well as trench out roughly 55 feet of the outside sewer yard line to the city tap and replace using schedule 40 pvc. bed in new line with sand, Aug 19, 2025).
How do I get alerts for new permits at 2312 Village Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 2310 Village CirAug 17, 2026Building#1: retroactively permit attached covered patio · 18 m away
- 2309 Village Way DrNov 5, 2024Interior remodel whole home remodel: replace cast-iron pipe; install new water lines tankless hot water heater and plumbing fixtures (reference 2024-077195 pp); replace electric panel/aluminum wiring install new outlets/switches/lighting: install new hvac system; remove wall and install beam; install 1 new window enlarge kitchen window replace remaining windows; install new doors flooring cabinetry doors and trim. rolling in expired permit 2018-175921 ep - replace 125 main panel only to residence · 46 m away
- 2321 Village CirAug 19, 2025Excavate roughly 65-70 feet from under the foundation of the home to expose and replace the sewer lines with schedule 40 pvc. hang all new pipe using clevis hangers. as well as trench out roughly 55 feet of the outside sewer yard line to the city tap and replace using schedule 40 pvc. bed in new line with sand · 54 m away
- 2307 Village Way DrFeb 29, 2024Express foundation repair · 64 m away
- 2306 Village CirNov 27, 2023New irrigation system · 67 m away
- 5403 Fernview RdJul 14, 2025New attached pergola · 70 m away
- 5407 Buffalo PassNov 17, 202615-foot tunnel for sewer repair. tunneling right side of home no other work being done · 78 m away
- 5404 Fernview RdMar 3, 2026Excavate 20 feet under the homes foundation to expose sewer line to perform repair. hang all new pipe with clevis hangers per code · 82 m away
- 5409 Buffalo PassApr 14, 2025Trench thru yard to replace yard sewer · 84 m away
- 2317 Village CirApr 23, 2024Excavate roughly 80 feet from under the foundation of the home to expose all the cast iron sewer lines. once exposed remove all cast iron lines and replace using schedule 40 pvc hang new lines per code using clevis hangers · 86 m away
- 2304 Village CirMay 13, 2025Sewer line replacement · 88 m away
- 2308 Chasewych DrMar 11, 2025Relocate gas stub out for new gas meter location · 98 m away