2310 Village Cir
Austin, TX 78745
Permits for a detached dwelling, pool and covered patio
Permits at 2310 Village Cir cover a new one-story detached dwelling unit with one bedroom and one bathroom, an in-ground pool, and a covered patio. The pool and patio building permit was filed June 25, 2025; the building permit for the detached dwelling unit followed on September 26, 2025.
Summarized from City of Austin records · updated Aug 17, 2026
- Projects
- 10
- 10 filings
- Latest filing
- Aug 17, 2026
- since Jun 25, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledBuilding#1: retroactively permit attached covered patio
- AppliedMar 29, 2024
- IssuedAug 17, 2026
- WorkAug '26 – Aug '26
- Final inspectionAug 18, 2026
Passed final inspection Aug 18, 2026.
1 contact on this project · 1 phone number
Permit & project history
10 projectsBuilding#1: retroactively permit attached covered patio
Building#1: retroactively permit attached covered patio
City of Austin permitElectrical PermitFinal- Record
- 2025-120839 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Building#1: retroactively permit attached covered patio
Building#1: retroactively permit attached covered patio
City of Austin permitBuilding PermitFinal- Record
- 2025-120839 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Requesting permit to do a panel upgrade from150 to 200 amps will install a new meter can and new 200 amp panel
Requesting permit to do a panel upgrade from150 to 200 amps will install a new meter can and new 200 amp panel
City of Austin permitElectrical PermitFinal- Record
- 2026-066615 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
*new in ground pool with pool coping and equipment pad* new permit for covered patio and new adu under 2024-039785 pr
*new in ground pool with pool coping and equipment pad* new permit for covered patio and new adu under 2024-039785 pr
City of Austin permitPlumbing PermitFinal- Record
- 2025-078457 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
*new in ground pool with pool coping and equipment pad* new permit for covered patio and new adu under 2024-039785 pr
*new in ground pool with pool coping and equipment pad* new permit for covered patio and new adu under 2024-039785 pr
City of Austin permitElectrical PermitFinal- Record
- 2025-078457 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Building #2: new 1-story detached dwelling unit 1 bed/1 bath
Building #2: new 1-story detached dwelling unit 1 bed/1 bath
City of Austin permitMechanical PermitFinal- Record
- 2025-120838 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Building #2: new 1-story detached dwelling unit 1 bed/1 bath gate code 1123
Building #2: new 1-story detached dwelling unit 1 bed/1 bath gate code 1123
City of Austin permitElectrical PermitFinal- Record
- 2025-120838 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Building #2: new 1-story detached dwelling unit 1 bed/1 bath
Building #2: new 1-story detached dwelling unit 1 bed/1 bath
City of Austin permitPlumbing PermitFinal- Record
- 2025-120838 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Building #2: new 1-story detached dwelling unit 1 bed/1 bath
Building #2: new 1-story detached dwelling unit 1 bed/1 bath
City of Austin permitBuilding PermitFinal- Record
- 2025-120838 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
*new in ground pool with pool coping and equipment pad* new permit for covered patio and new adu under 2024-039785 pr
*new in ground pool with pool coping and equipment pad* new permit for covered patio and new adu under 2024-039785 pr
City of Austin permitBuilding PermitFinal- Record
- 2025-078457 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2310 Village Cir
What is being built at 2310 Village Cir?
City of Austin permits describe a new one-story detached dwelling unit with one bedroom and one bathroom, an in-ground pool, and a covered patio. The first listed building permit for this work was filed June 25, 2025.
Is a new detached unit planned at 2310 Village Cir?
Yes. A building permit filed September 26, 2025, describes a new one-story detached dwelling unit with one bedroom and one bathroom.
Does the project at 2310 Village Cir include a pool?
Yes. Permit descriptions call for a new in-ground pool with pool coping and an equipment pad. The related building permit was filed June 25, 2025.
Is a covered patio included at 2310 Village Cir?
Yes. Permit records include a covered patio, and a July 7, 2026, building permit retroactively permits an attached covered patio.
When were permits filed for the work at 2310 Village Cir?
The listed pool and patio building permit was filed June 25, 2025, and the detached dwelling unit building permit was filed September 26, 2025. Related permits continued through August 17, 2026.
Was an electrical panel upgrade permitted at 2310 Village Cir?
Yes. An electrical permit filed June 1, 2026, describes upgrading the service from 150 to 200 amps and installing a new meter can and 200-amp panel.
Also being built nearby
All of 78745- 2312 Village CirMay 6, 2025We will be upgrading from 100amp panel to 150amp panel · 18 m away
- 2321 Village CirAug 19, 2025Excavate roughly 65-70 feet from under the foundation of the home to expose and replace the sewer lines with schedule 40 pvc. hang all new pipe using clevis hangers. as well as trench out roughly 55 feet of the outside sewer yard line to the city tap and replace using schedule 40 pvc. bed in new line with sand · 44 m away
- 2309 Village Way DrNov 5, 2024Interior remodel whole home remodel: replace cast-iron pipe; install new water lines tankless hot water heater and plumbing fixtures (reference 2024-077195 pp); replace electric panel/aluminum wiring install new outlets/switches/lighting: install new hvac system; remove wall and install beam; install 1 new window enlarge kitchen window replace remaining windows; install new doors flooring cabinetry doors and trim. rolling in expired permit 2018-175921 ep - replace 125 main panel only to residence · 47 m away
- 2306 Village CirNov 27, 2023New irrigation system · 51 m away
- 2307 Village Way DrFeb 29, 2024Express foundation repair · 57 m away
- 5403 Fernview RdJul 14, 2025New attached pergola · 63 m away
- 2317 Village CirApr 23, 2024Excavate roughly 80 feet from under the foundation of the home to expose all the cast iron sewer lines. once exposed remove all cast iron lines and replace using schedule 40 pvc hang new lines per code using clevis hangers · 69 m away
- 2304 Village CirMay 13, 2025Sewer line replacement · 73 m away
- 5404 Fernview RdMar 3, 2026Excavate 20 feet under the homes foundation to expose sewer line to perform repair. hang all new pipe with clevis hangers per code · 86 m away
- 2308 Chasewych DrMar 11, 2025Relocate gas stub out for new gas meter location · 88 m away
- 5407 Buffalo PassNov 17, 202615-foot tunnel for sewer repair. tunneling right side of home no other work being done · 94 m away
- 5409 Buffalo PassApr 14, 2025Trench thru yard to replace yard sewer · 98 m away
More pools in 78745.