Electrical panel repair permitted at 307 Thistlewood Dr
A City of Austin electrical permit covers a same-size repair to the electrical panel at 307 Thistlewood Dr. The permit was filed on January 20, 2026, and is marked final.
Summarized from City of Austin records · updated Jan 20, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 20, 2026
- since Jan 20, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRepalacing phase a coming from the utility pole needs to be repaired per austin energy ae shut off service no meter work repair made on panel same size
- AppliedJan 20, 2026
- IssuedJan 20, 2026
- WorkJan '26 – Jan '26
- Final inspectionJan 20, 2026
Passed final inspection Jan 20, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectRepalacing phase a coming from the utility pole needs to be repaired per austin energy ae shut off service no meter work repair made on panel same size
Repalacing phase a coming from the utility pole needs to be repaired per austin energy ae shut off service no meter work repair made on panel same size
City of Austin permitElectrical PermitFinal- Record
- 2026-006822 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 307 Thistlewood Dr
What work is being done at 307 Thistlewood Dr?
A City of Austin electrical permit describes a same-size repair to the electrical panel after Austin Energy shut off service. The permit is 2026-006822 EP.
When was the electrical permit filed for 307 Thistlewood Dr?
The permit was filed on January 20, 2026.
Is the permit for a new home at 307 Thistlewood Dr?
The record describes electrical panel repair, not new home construction.
What is the status of permit 2026-006822 EP?
The City of Austin permit is marked final.
Does the permit include meter work at 307 Thistlewood Dr?
No. The permit description says there was no meter work; it describes a same-size repair to the panel.
Also being built nearby
All of 78745- 401 Thistlewood DrSep 16, 2025Replacement of 65 of yard line will have excavation crew dig down 16 down from the meter to the house under both sidewalks and driveway will replace the 3/4 copper with 3/4 pex from the meter to the house · 38 m away
- 303 Thistlewood DrApr 21, 2025Express: replace siding and windows · 40 m away
- 304 Thistlewood DrAug 11, 2025200 amp panel and meter replacement grounding and bonding · 52 m away
- 303 Wood Bine DrNov 13, 2024Replacement of an existing water heater 40gal gas water heater changeout · 90 m away
- 401 Heartwood DrFeb 24, 2026Install an irrigation to permit address · 96 m away
- 305 Wood Bine DrSep 21, 2026Main breaker was loose and tripping. met ae on site. replaced 200 amp main breaker and tightened all connections. everything working at this time. sent photos to charles mcconnell · 96 m away
- 314 Wood Bine DrOct 31, 2024Replacement of complete existing central heat and air system with or without duct work · 110 m away
- 312 Heartwood DrMay 7, 2024Replacement of complete existing central heat and air system with or without duct work · 118 m away
- 411 Thistlewood DrJun 29, 2026Excavate and install a new sewer yard line approximately 40 long with connections to the washer box and kitchen sink on the exterior of the house. also excavate approximately 15 of tunnel under the home to replace the underground plumbing for the bathrooms. 3x3 access hole will be located in the back yard just to the right of the back patio · 138 m away
- 5000 Hedgewood DrJul 29, 2026Hvac change out · 145 m away
- 328 Heartwood DrOct 9, 2010328 heartwood dr · 147 m away
- 410 Thistlewood DrFeb 7, 2024Repair of failed drain pipe by tunnel · 156 m away