Recent · latest filing Jul 2026Residential
5000 Hedgewood Dr
Austin, TX 78745
HVAC change-out permitted at 5000 Hedgewood Dr
An HVAC change-out is listed at 5000 Hedgewood Dr in Austin. The City of Austin issued active mechanical permit 2026-096579 MP on July 29, 2026.
Summarized from City of Austin records · updated Jul 29, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 29, 2026
- since Jul 29, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectHvac change out
Hvac change out
City of Austin permitMechanical PermitActive- Record
- 2026-096579 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5000 Hedgewood Dr
What is being done at 5000 Hedgewood Dr in Austin?
A City of Austin mechanical permit lists an HVAC change-out at the address.
When was the HVAC permit issued for 5000 Hedgewood Dr?
Permit 2026-096579 MP is dated July 29, 2026.
Is the permit for 5000 Hedgewood Dr active?
Yes. City of Austin permit 2026-096579 MP is listed as active.
What kind of work does permit 2026-096579 MP cover?
The permit description is “Hvac change out.” The record does not specify further details about the equipment or work.
Is a new building being built at 5000 Hedgewood Dr?
The available City of Austin record lists a mechanical permit for an HVAC change-out, not new construction.
Also being built nearby
All of 78745- 5001 Greenheart DrJun 23, 2026Tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds: one in front one on the side and one behind the house · 42 m away
- 314 Wood Bine DrOct 31, 2024Replacement of complete existing central heat and air system with or without duct work · 44 m away
- 305 Wood Bine DrSep 21, 2026Main breaker was loose and tripping. met ae on site. replaced 200 amp main breaker and tightened all connections. everything working at this time. sent photos to charles mcconnell · 72 m away
- 411 Thistlewood DrJun 29, 2026Excavate and install a new sewer yard line approximately 40 long with connections to the washer box and kitchen sink on the exterior of the house. also excavate approximately 15 of tunnel under the home to replace the underground plumbing for the bathrooms. 3x3 access hole will be located in the back yard just to the right of the back patio · 80 m away
- 413 Thistlewood DrApr 9, 2026Interior remodel kitchen walls to be removed main bath replace fixtures bath 2 replace fixtures remove load bearing wall replace gas water heater with tankless remove replace electrical wiring with copper wiring throughout · 89 m away
- 5002 Greenheart DrMar 12, 2024Installation of mini-split system · 90 m away
- 303 Wood Bine DrNov 13, 2024Replacement of an existing water heater 40gal gas water heater changeout · 91 m away
- 500 Wood Bine DrOct 29, 2024Sewer line replacement 40 ft on front yard · 102 m away
- 5004 Greenheart DrSep 25, 2024Replacement of complete existing central heat and air system with or without duct work · 102 m away
- 401 Thistlewood DrSep 16, 2025Replacement of 65 of yard line will have excavation crew dig down 16 down from the meter to the house under both sidewalks and driveway will replace the 3/4 copper with 3/4 pex from the meter to the house · 115 m away
- 410 Thistlewood DrFeb 7, 2024Repair of failed drain pipe by tunnel · 126 m away
- 5009 Creekline DrJul 25, 2024Tunnel under foundation to access cast-iron drain pipe to kitchen sink replace with new pvc drain pipe approximately 15ft under foundation · 133 m away