5004 Greenheart Dr
Austin, TX 78745
5004 Greenheart Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 5004 Greenheart Dr, Austin, TX 78745. The most recent, filed September 25, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Sep 25, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 25, 2024
- since Sep 25, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of complete existing central heat and air system with or without duct work
- AppliedSep 13, 2024
- IssuedSep 25, 2024
- !WorkSep '24 – Mar '25
- Final inspection
Marked expired Mar 25, 2025.
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitExpired- Record
- 2024-124929 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5004 Greenheart Dr
What is being built at 5004 Greenheart Dr?
The latest filing (City of Austin permit 2024-124929 MP, September 25, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 5004 Greenheart Dr have?
1 filing across 1 project, from September 25, 2024 to September 25, 2024.
Is there other construction near 5004 Greenheart Dr?
Yes. Nearby filings include 5002 Greenheart Dr (installation of mini-split system, Mar 12, 2024); 5009 Creekline Dr (tunnel under foundation to access cast-iron drain pipe to kitchen sink replace with new pvc drain pipe approximately 15ft under foundation, Jul 25, 2024); 5001 Greenheart Dr (tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds: one in front one on the side and one behind the house, Jun 23, 2026).
How do I get alerts for new permits at 5004 Greenheart Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 5002 Greenheart DrMar 12, 2024Installation of mini-split system · 26 m away
- 5009 Creekline DrJul 25, 2024Tunnel under foundation to access cast-iron drain pipe to kitchen sink replace with new pvc drain pipe approximately 15ft under foundation · 42 m away
- 5001 Greenheart DrJun 23, 2026Tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds: one in front one on the side and one behind the house · 67 m away
- 5106 Greenheart DrMar 26, 2025100 tunnel below the foundation to replace the entire cast iron drain system and 40 trench thru yard to replace yard sewer. 4 access holes - 2 back 1 right 1 left · 74 m away
- 5105 Creekline DrFeb 12, 2024Updating electrical meter and panel. meter overhead damage repair service · 78 m away
- 5012 Creekline DrAug 14, 2026Replacement of an existing water heater 50 gallon natural gas water heater replacement · 84 m away
- 500 Wood Bine DrOct 29, 2024Sewer line replacement 40 ft on front yard · 86 m away
- 5102 Creekline DrMar 11, 2025Tunnel 5 ft under the home to locate the break and make necessary repairs · 93 m away
- 5107 Creekline DrFeb 26, 2024Replacement of sanitary system · 95 m away
- 5008 Creekline DrAug 14, 2025Replacement of complete existing central heat and air system with or without duct work · 95 m away
- 5000 Hedgewood DrJul 29, 2026Hvac change out · 102 m away
- 5001 Creekline DrOct 7, 2026Tunnel; repair/replacement of (1) bathtub drain · 129 m away