5008 Creekline Dr
Austin, TX 78745
5008 Creekline Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 5008 Creekline Dr, Austin, TX 78745. The most recent, filed August 14, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Aug 14, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 14, 2025
- since Aug 14, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedAug 13, 2025
- IssuedAug 14, 2025
- WorkAug '25 – Sep '25
- Final inspectionSep 26, 2025
Passed final inspection Sep 26, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-102516 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5008 Creekline Dr
What is being built at 5008 Creekline Dr?
The latest filing (City of Austin permit 2025-102516 MP, August 14, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 5008 Creekline Dr have?
1 filing across 1 project, from August 14, 2025 to August 14, 2025.
Is there other construction near 5008 Creekline Dr?
Yes. Nearby filings include 5012 Creekline Dr (replacement of an existing water heater 50 gallon natural gas water heater replacement, Aug 14, 2026); 5009 Creekline Dr (tunnel under foundation to access cast-iron drain pipe to kitchen sink replace with new pvc drain pipe approximately 15ft under foundation, Jul 25, 2024); 500 Wood Bine Dr (sewer line replacement 40 ft on front yard, Oct 29, 2024).
How do I get alerts for new permits at 5008 Creekline Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 5012 Creekline DrAug 14, 2026Replacement of an existing water heater 50 gallon natural gas water heater replacement · 38 m away
- 5009 Creekline DrJul 25, 2024Tunnel under foundation to access cast-iron drain pipe to kitchen sink replace with new pvc drain pipe approximately 15ft under foundation · 57 m away
- 500 Wood Bine DrOct 29, 2024Sewer line replacement 40 ft on front yard · 74 m away
- 5102 Creekline DrMar 11, 2025Tunnel 5 ft under the home to locate the break and make necessary repairs · 75 m away
- 5001 Creekline DrOct 7, 2026Tunnel; repair/replacement of (1) bathtub drain · 81 m away
- 5002 Greenheart DrMar 12, 2024Installation of mini-split system · 83 m away
- 5004 Greenheart DrSep 25, 2024Replacement of complete existing central heat and air system with or without duct work · 95 m away
- 5105 Creekline DrFeb 12, 2024Updating electrical meter and panel. meter overhead damage repair service · 104 m away
- 5107 Creekline DrFeb 26, 2024Replacement of sanitary system · 121 m away
- 5001 Greenheart DrJun 23, 2026Tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds: one in front one on the side and one behind the house · 123 m away
- 5106 Greenheart DrMar 26, 2025100 tunnel below the foundation to replace the entire cast iron drain system and 40 trench thru yard to replace yard sewer. 4 access holes - 2 back 1 right 1 left · 141 m away
- 4903 Creekline DrDec 5, 2024Express: replace siding replace windows like for like revision-mechanical work (install new ac system) revision 2: add plumbing and electrical permits · 147 m away