5106 Greenheart Dr
Austin, TX 78745
5106 Greenheart Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 5106 Greenheart Dr, Austin, TX 78745. The most recent, filed March 26, 2025, covers: “100 tunnel below the foundation to replace the entire cast iron drain system and 40 trench thru yard to replace yard sewer. 4 access holes - 2 back 1 right 1 left”.
Compiled from City of Austin records · updated Mar 26, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 26, 2025
- since Mar 26, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled100 tunnel below the foundation to replace the entire cast iron drain system and 40 trench thru yard to replace yard sewer. 4 access holes - 2 back 1 right 1 left
- AppliedMar 11, 2025
- IssuedMar 26, 2025
- WorkMar '25 – Apr '25
- Final inspectionApr 9, 2025
Passed final inspection Apr 9, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 project100 tunnel below the foundation to replace the entire cast iron drain system and 40 trench thru yard to replace yard sewer. 4 access holes - 2 back 1 right 1 left
100 tunnel below the foundation to replace the entire cast iron drain system and 40 trench thru yard to replace yard sewer. 4 access holes - 2 back 1 right 1 left
City of Austin permitPlumbing PermitFinal- Record
- 2025-029351 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5106 Greenheart Dr
What is being built at 5106 Greenheart Dr?
The latest filing (City of Austin permit 2025-029351 PP, March 26, 2025) covers 100 tunnel below the foundation to replace the entire cast iron drain system and 40 trench thru yard to replace yard sewer. 4 access holes - 2 back 1 right 1 left.
How many permits and filings does 5106 Greenheart Dr have?
1 filing across 1 project, from March 26, 2025 to March 26, 2025.
Is there other construction near 5106 Greenheart Dr?
Yes. Nearby filings include 5105 Creekline Dr (updating electrical meter and panel. meter overhead damage repair service, Feb 12, 2024); 5107 Creekline Dr (replacement of sanitary system, Feb 26, 2024); 5112 Greenheart Dr (*partial demolition* addition to single-story sfr with interior remodel and new pool (no autofill or heating), Feb 24, 2025).
How do I get alerts for new permits at 5106 Greenheart Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 5105 Creekline DrFeb 12, 2024Updating electrical meter and panel. meter overhead damage repair service · 51 m away
- 5107 Creekline DrFeb 26, 2024Replacement of sanitary system · 53 m away
- 5112 Greenheart DrFeb 24, 2025*partial demolition* addition to single-story sfr with interior remodel and new pool (no autofill or heating) · 65 m away
- 5004 Greenheart DrSep 25, 2024Replacement of complete existing central heat and air system with or without duct work · 74 m away
- 5009 Creekline DrJul 25, 2024Tunnel under foundation to access cast-iron drain pipe to kitchen sink replace with new pvc drain pipe approximately 15ft under foundation · 88 m away
- 5102 Creekline DrMar 11, 2025Tunnel 5 ft under the home to locate the break and make necessary repairs · 93 m away
- 5002 Greenheart DrMar 12, 2024Installation of mini-split system · 99 m away
- 5012 Creekline DrAug 14, 2026Replacement of an existing water heater 50 gallon natural gas water heater replacement · 112 m away
- 5201 Harvest CirOct 24, 2024Replacement of an existing water heater · 117 m away
- 5115 Creekline DrAug 6, 2026Tunnel under foundation to replace cast irons drain lines for 2 full bathrooms kitchen and washer drain line. total length of tunnel is approximately 80 feet with 3 access holes one located in the back left corner of the home the second located by kitchen drain and the third where drain line exits the foundation. sewer line replacement from the home to the city tap connection total length is approximately 40 feet · 118 m away
- 5202 Hedgewood DrJul 31, 2025Express: remove and replace 7 windows (like for like) · 130 m away
- 5001 Greenheart DrJun 23, 2026Tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds: one in front one on the side and one behind the house · 136 m away