5105 Creekline Dr
Austin, TX 78745
5105 Creekline Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 5105 Creekline Dr, Austin, TX 78745. The most recent, filed February 12, 2024, covers: “Updating electrical meter and panel. meter overhead damage repair service”.
Compiled from City of Austin records · updated Feb 12, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 12, 2024
- since Feb 12, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredUpdating electrical meter and panel. meter overhead damage repair service
- AppliedFeb 5, 2024
- IssuedFeb 12, 2024
- !WorkFeb '24 – Aug '24
- Final inspection
Marked expired Aug 12, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectUpdating electrical meter and panel. meter overhead damage repair service
Updating electrical meter and panel. meter overhead damage repair service
City of Austin permitElectrical PermitExpired- Record
- 2024-014480 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5105 Creekline Dr
What is being built at 5105 Creekline Dr?
The latest filing (City of Austin permit 2024-014480 EP, February 12, 2024) covers updating electrical meter and panel. meter overhead damage repair service.
How many permits and filings does 5105 Creekline Dr have?
1 filing across 1 project, from February 12, 2024 to February 12, 2024.
Is there other construction near 5105 Creekline Dr?
Yes. Nearby filings include 5107 Creekline Dr (replacement of sanitary system, Feb 26, 2024); 5102 Creekline Dr (tunnel 5 ft under the home to locate the break and make necessary repairs, Mar 11, 2025); 5106 Greenheart Dr (100 tunnel below the foundation to replace the entire cast iron drain system and 40 trench thru yard to replace yard sewer. 4 access holes - 2 back 1 right 1 left, Mar 26, 2025).
How do I get alerts for new permits at 5105 Creekline Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 5107 Creekline DrFeb 26, 2024Replacement of sanitary system · 19 m away
- 5102 Creekline DrMar 11, 2025Tunnel 5 ft under the home to locate the break and make necessary repairs · 42 m away
- 5106 Greenheart DrMar 26, 2025100 tunnel below the foundation to replace the entire cast iron drain system and 40 trench thru yard to replace yard sewer. 4 access holes - 2 back 1 right 1 left · 51 m away
- 5009 Creekline DrJul 25, 2024Tunnel under foundation to access cast-iron drain pipe to kitchen sink replace with new pvc drain pipe approximately 15ft under foundation · 64 m away
- 5012 Creekline DrAug 14, 2026Replacement of an existing water heater 50 gallon natural gas water heater replacement · 69 m away
- 5004 Greenheart DrSep 25, 2024Replacement of complete existing central heat and air system with or without duct work · 78 m away
- 5112 Greenheart DrFeb 24, 2025*partial demolition* addition to single-story sfr with interior remodel and new pool (no autofill or heating) · 78 m away
- 5115 Creekline DrAug 6, 2026Tunnel under foundation to replace cast irons drain lines for 2 full bathrooms kitchen and washer drain line. total length of tunnel is approximately 80 feet with 3 access holes one located in the back left corner of the home the second located by kitchen drain and the third where drain line exits the foundation. sewer line replacement from the home to the city tap connection total length is approximately 40 feet · 95 m away
- 5002 Greenheart DrMar 12, 2024Installation of mini-split system · 96 m away
- 5008 Creekline DrAug 14, 2025Replacement of complete existing central heat and air system with or without duct work · 104 m away
- 5201 Harvest CirOct 24, 2024Replacement of an existing water heater · 122 m away
- 5119 Creekline DrSep 5, 2024Replacement of complete existing central heat and air system with or without duct work · 134 m away