5002 Greenheart Dr
Austin, TX 78745
5002 Greenheart Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 5002 Greenheart Dr, Austin, TX 78745. The most recent, filed March 12, 2024, covers: “Installation of mini-split system”.
Compiled from City of Austin records · updated Mar 12, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 12, 2024
- since Mar 12, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstallation of mini-split system
- AppliedMar 7, 2024
- IssuedMar 12, 2024
- WorkMar '24 – Mar '24
- Final inspectionMar 19, 2024
Passed final inspection Mar 19, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstallation of mini-split system
Installation of mini-split system
City of Austin permitMechanical PermitFinal- Record
- 2024-028567 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5002 Greenheart Dr
What is being built at 5002 Greenheart Dr?
The latest filing (City of Austin permit 2024-028567 MP, March 12, 2024) covers installation of mini-split system.
How many permits and filings does 5002 Greenheart Dr have?
1 filing across 1 project, from March 12, 2024 to March 12, 2024.
Is there other construction near 5002 Greenheart Dr?
Yes. Nearby filings include 5004 Greenheart Dr (replacement of complete existing central heat and air system with or without duct work, Sep 25, 2024); 5009 Creekline Dr (tunnel under foundation to access cast-iron drain pipe to kitchen sink replace with new pvc drain pipe approximately 15ft under foundation, Jul 25, 2024); 5001 Greenheart Dr (tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds: one in front one on the side and one behind the house, Jun 23, 2026).
How do I get alerts for new permits at 5002 Greenheart Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 5004 Greenheart DrSep 25, 2024Replacement of complete existing central heat and air system with or without duct work · 26 m away
- 5009 Creekline DrJul 25, 2024Tunnel under foundation to access cast-iron drain pipe to kitchen sink replace with new pvc drain pipe approximately 15ft under foundation · 43 m away
- 5001 Greenheart DrJun 23, 2026Tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds: one in front one on the side and one behind the house · 51 m away
- 500 Wood Bine DrOct 29, 2024Sewer line replacement 40 ft on front yard · 61 m away
- 5008 Creekline DrAug 14, 2025Replacement of complete existing central heat and air system with or without duct work · 83 m away
- 5012 Creekline DrAug 14, 2026Replacement of an existing water heater 50 gallon natural gas water heater replacement · 83 m away
- 5000 Hedgewood DrJul 29, 2026Hvac change out · 90 m away
- 5105 Creekline DrFeb 12, 2024Updating electrical meter and panel. meter overhead damage repair service · 96 m away
- 5106 Greenheart DrMar 26, 2025100 tunnel below the foundation to replace the entire cast iron drain system and 40 trench thru yard to replace yard sewer. 4 access holes - 2 back 1 right 1 left · 99 m away
- 5102 Creekline DrMar 11, 2025Tunnel 5 ft under the home to locate the break and make necessary repairs · 102 m away
- 5001 Creekline DrOct 7, 2026Tunnel; repair/replacement of (1) bathtub drain · 105 m away
- 5107 Creekline DrFeb 26, 2024Replacement of sanitary system · 114 m away