5001 Greenheart Dr
Austin, TX 78745
Drain-line and HVAC work permitted at 5001 Greenheart Dr
Permits cover replacement of drain lines and the existing central heating and air system at 5001 Greenheart Dr. The HVAC permit was filed May 24, 2026, and the plumbing permit was filed June 23, 2026.
Summarized from City of Austin records · updated Jun 23, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jun 23, 2026
- since May 24, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds: one in front one on the side and one behind the house
- AppliedJun 23, 2026
- IssuedJun 23, 2026
- WorkJun '26 – Jul '26
- Final inspectionJul 20, 2026
Passed final inspection Jul 20, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsTunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds: one in front one on the side and one behind the house
Tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds: one in front one on the side and one behind the house
City of Austin permitPlumbing PermitFinal- Record
- 2026-080005 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work we will be replacing the complete central system only. no ductwork will be replaced.1
Replacement of complete existing central heat and air system with or without duct work we will be replacing the complete central system only. no ductwork will be replaced.1
City of Austin permitMechanical PermitActive- Record
- 2026-061601 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5001 Greenheart Dr
What work is planned at 5001 Greenheart Dr in Austin?
City of Austin permits describe replacing the home's cast-iron drain lines with PVC and replacing its central heating and air system.
When were permits filed for 5001 Greenheart Dr?
The mechanical permit, 2026-061601 MP, was filed May 24, 2026. The plumbing permit, 2026-080005 PP, was filed June 23, 2026.
Is a new building being built at 5001 Greenheart Dr?
The records provided describe work on an existing home, not construction of a new building.
Are the ducts being replaced at 5001 Greenheart Dr?
The mechanical permit describes replacing the central heating and air system and says no ductwork will be replaced.
What is the status of the permits at 5001 Greenheart Dr?
The plumbing permit, 2026-080005 PP, is listed as Final. The mechanical permit, 2026-061601 MP, is listed as Active.
Also being built nearby
All of 78745- 5000 Hedgewood DrJul 29, 2026Hvac change out · 42 m away
- 5002 Greenheart DrMar 12, 2024Installation of mini-split system · 51 m away
- 500 Wood Bine DrOct 29, 2024Sewer line replacement 40 ft on front yard · 66 m away
- 5004 Greenheart DrSep 25, 2024Replacement of complete existing central heat and air system with or without duct work · 67 m away
- 314 Wood Bine DrOct 31, 2024Replacement of complete existing central heat and air system with or without duct work · 74 m away
- 411 Thistlewood DrJun 29, 2026Excavate and install a new sewer yard line approximately 40 long with connections to the washer box and kitchen sink on the exterior of the house. also excavate approximately 15 of tunnel under the home to replace the underground plumbing for the bathrooms. 3x3 access hole will be located in the back yard just to the right of the back patio · 85 m away
- 413 Thistlewood DrApr 9, 2026Interior remodel kitchen walls to be removed main bath replace fixtures bath 2 replace fixtures remove load bearing wall replace gas water heater with tankless remove replace electrical wiring with copper wiring throughout · 85 m away
- 5009 Creekline DrJul 25, 2024Tunnel under foundation to access cast-iron drain pipe to kitchen sink replace with new pvc drain pipe approximately 15ft under foundation · 93 m away
- 5001 Creekline DrOct 7, 2026Tunnel; repair/replacement of (1) bathtub drain · 110 m away
- 305 Wood Bine DrSep 21, 2026Main breaker was loose and tripping. met ae on site. replaced 200 amp main breaker and tightened all connections. everything working at this time. sent photos to charles mcconnell · 114 m away
- 5008 Creekline DrAug 14, 2025Replacement of complete existing central heat and air system with or without duct work · 123 m away
- 410 Thistlewood DrFeb 7, 2024Repair of failed drain pipe by tunnel · 128 m away
More restaurants in 78745.