314 Wood Bine Dr
Austin, TX 78745
314 Wood Bine Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 314 Wood Bine Dr, Austin, TX 78745. The most recent, filed October 31, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Oct 31, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 31, 2024
- since Oct 31, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedOct 18, 2024
- IssuedOct 31, 2024
- WorkOct '24 – Apr '25
- Final inspectionNov 25, 2024
Passed final inspection Nov 25, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-140915 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 314 Wood Bine Dr
What is being built at 314 Wood Bine Dr?
The latest filing (City of Austin permit 2024-140915 MP, October 31, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 314 Wood Bine Dr have?
1 filing across 1 project, from October 31, 2024 to October 31, 2024.
Is there other construction near 314 Wood Bine Dr?
Yes. Nearby filings include 5000 Hedgewood Dr (hvac change out, Jul 29, 2026); 411 Thistlewood Dr (excavate and install a new sewer yard line approximately 40 long with connections to the washer box and kitchen sink on the exterior of the house. also excavate approximately 15 of tunnel under the home to replace the underground plumbing for the bathrooms. 3x3 access hole will be located in the back yard just to the right of the back patio, Jun 29, 2026); 413 Thistlewood Dr (interior remodel kitchen walls to be removed main bath replace fixtures bath 2 replace fixtures remove load bearing wall replace gas water heater with tankless remove replace electrical wiring with copper wiring throughout, Apr 9, 2026).
How do I get alerts for new permits at 314 Wood Bine Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 5000 Hedgewood DrJul 29, 2026Hvac change out · 44 m away
- 411 Thistlewood DrJun 29, 2026Excavate and install a new sewer yard line approximately 40 long with connections to the washer box and kitchen sink on the exterior of the house. also excavate approximately 15 of tunnel under the home to replace the underground plumbing for the bathrooms. 3x3 access hole will be located in the back yard just to the right of the back patio · 51 m away
- 413 Thistlewood DrApr 9, 2026Interior remodel kitchen walls to be removed main bath replace fixtures bath 2 replace fixtures remove load bearing wall replace gas water heater with tankless remove replace electrical wiring with copper wiring throughout · 69 m away
- 305 Wood Bine DrSep 21, 2026Main breaker was loose and tripping. met ae on site. replaced 200 amp main breaker and tightened all connections. everything working at this time. sent photos to charles mcconnell · 69 m away
- 5001 Greenheart DrJun 23, 2026Tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds: one in front one on the side and one behind the house · 74 m away
- 401 Thistlewood DrSep 16, 2025Replacement of 65 of yard line will have excavation crew dig down 16 down from the meter to the house under both sidewalks and driveway will replace the 3/4 copper with 3/4 pex from the meter to the house · 76 m away
- 303 Wood Bine DrNov 13, 2024Replacement of an existing water heater 40gal gas water heater changeout · 85 m away
- 410 Thistlewood DrFeb 7, 2024Repair of failed drain pipe by tunnel · 95 m away
- 307 Thistlewood DrJan 20, 2026Repalacing phase a coming from the utility pole needs to be repaired per austin energy ae shut off service no meter work repair made on panel same size · 110 m away
- 500 Wood Bine DrOct 29, 2024Sewer line replacement 40 ft on front yard · 115 m away
- 5002 Greenheart DrMar 12, 2024Installation of mini-split system · 125 m away
- 303 Thistlewood DrApr 21, 2025Express: replace siding and windows · 141 m away