500 Wood Bine Dr
Austin, TX 78745
500 Wood Bine Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 500 Wood Bine Dr, Austin, TX 78745. The most recent, filed October 29, 2024, covers: “Sewer line replacement 40 ft on front yard”.
Compiled from City of Austin records · updated Oct 29, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 29, 2024
- since Oct 29, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledSewer line replacement 40 ft on front yard
- AppliedOct 23, 2024
- IssuedOct 29, 2024
- WorkOct '24 – Nov '24
- Final inspectionNov 12, 2024
Passed final inspection Nov 12, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectSewer line replacement 40 ft on front yard
Sewer line replacement 40 ft on front yard
City of Austin permitPlumbing PermitFinal- Record
- 2024-142747 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 500 Wood Bine Dr
What is being built at 500 Wood Bine Dr?
The latest filing (City of Austin permit 2024-142747 PP, October 29, 2024) covers sewer line replacement 40 ft on front yard.
How many permits and filings does 500 Wood Bine Dr have?
1 filing across 1 project, from October 29, 2024 to October 29, 2024.
Is there other construction near 500 Wood Bine Dr?
Yes. Nearby filings include 5001 Creekline Dr (tunnel; repair/replacement of (1) bathtub drain, Oct 7, 2026); 5002 Greenheart Dr (installation of mini-split system, Mar 12, 2024); 5001 Greenheart Dr (tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds: one in front one on the side and one behind the house, Jun 23, 2026).
How do I get alerts for new permits at 500 Wood Bine Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 5001 Creekline DrOct 7, 2026Tunnel; repair/replacement of (1) bathtub drain · 47 m away
- 5002 Greenheart DrMar 12, 2024Installation of mini-split system · 61 m away
- 5001 Greenheart DrJun 23, 2026Tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds: one in front one on the side and one behind the house · 66 m away
- 5008 Creekline DrAug 14, 2025Replacement of complete existing central heat and air system with or without duct work · 74 m away
- 413 Thistlewood DrApr 9, 2026Interior remodel kitchen walls to be removed main bath replace fixtures bath 2 replace fixtures remove load bearing wall replace gas water heater with tankless remove replace electrical wiring with copper wiring throughout · 77 m away
- 5009 Creekline DrJul 25, 2024Tunnel under foundation to access cast-iron drain pipe to kitchen sink replace with new pvc drain pipe approximately 15ft under foundation · 79 m away
- 5004 Greenheart DrSep 25, 2024Replacement of complete existing central heat and air system with or without duct work · 86 m away
- 411 Thistlewood DrJun 29, 2026Excavate and install a new sewer yard line approximately 40 long with connections to the washer box and kitchen sink on the exterior of the house. also excavate approximately 15 of tunnel under the home to replace the underground plumbing for the bathrooms. 3x3 access hole will be located in the back yard just to the right of the back patio · 91 m away
- 5012 Creekline DrAug 14, 2026Replacement of an existing water heater 50 gallon natural gas water heater replacement · 100 m away
- 5000 Hedgewood DrJul 29, 2026Hvac change out · 102 m away
- 4903 Creekline DrDec 5, 2024Express: replace siding replace windows like for like revision-mechanical work (install new ac system) revision 2: add plumbing and electrical permits · 113 m away
- 410 Thistlewood DrFeb 7, 2024Repair of failed drain pipe by tunnel · 113 m away