5500 Fernview Rd
Austin, TX 78745
Water heater replacement permitted at 5500 Fernview Rd
A City of Austin plumbing permit covers replacement of an existing water heater at 5500 Fernview Rd. The permit was filed on August 14, 2026, under permit number 2026-104855 PP.
Summarized from City of Austin records · updated Aug 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 14, 2026
- since Aug 14, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayReplacement of an existing water heater
- AppliedAug 12, 2026
- IssuedAug 14, 2026
- WorkAug '26 – Feb '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitActive- Record
- 2026-104855 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5500 Fernview Rd
What is being built at 5500 Fernview Rd?
The City of Austin permit covers replacement of an existing water heater, not a new building. It was filed August 14, 2026, as permit 2026-104855 PP.
Is there a new development planned at 5500 Fernview Rd in Austin?
The available record is for a plumbing permit to replace an existing water heater. It does not describe a new development.
When was the water heater permit filed at 5500 Fernview Rd?
The permit was filed on August 14, 2026. Its number is 2026-104855 PP.
What is permit 2026-104855 PP for?
It is a City of Austin plumbing permit for replacement of an existing water heater at 5500 Fernview Rd.
Does the permit show a project cost or building size?
No project cost or square footage is reported in the available permit record.
Also being built nearby
All of 78745- 5404 Fernview RdMar 3, 2026Excavate 20 feet under the homes foundation to expose sewer line to perform repair. hang all new pipe with clevis hangers per code · 27 m away
- 5501 Buffalo PassDec 12, 2023Replacement of an existing water heater · 37 m away
- 5403 Fernview RdJul 14, 2025New attached pergola · 62 m away
- 5409 Buffalo PassApr 14, 2025Trench thru yard to replace yard sewer · 69 m away
- 2308 Chasewych DrMar 11, 2025Relocate gas stub out for new gas meter location · 77 m away
- 2321 Village CirAug 19, 2025Excavate roughly 65-70 feet from under the foundation of the home to expose and replace the sewer lines with schedule 40 pvc. hang all new pipe using clevis hangers. as well as trench out roughly 55 feet of the outside sewer yard line to the city tap and replace using schedule 40 pvc. bed in new line with sand · 79 m away
- 5407 Buffalo PassNov 17, 202615-foot tunnel for sewer repair. tunneling right side of home no other work being done · 92 m away
- 2312 Village CirMay 6, 2025We will be upgrading from 100amp panel to 150amp panel · 108 m away
- 2310 Village CirAug 17, 2026Building#1: retroactively permit attached covered patio · 111 m away
- 5504 Buffalo PassAug 7, 2024Express: convert tub to shower · 113 m away
- 2317 Village CirApr 23, 2024Excavate roughly 80 feet from under the foundation of the home to expose all the cast iron sewer lines. once exposed remove all cast iron lines and replace using schedule 40 pvc hang new lines per code using clevis hangers · 122 m away
- 2304 Chasewych DrNov 6, 2026For both units on this property (residential duplex): replace existing main electrical service panels. install austin energy approved meter enclosures and 100 amp panels. the approved espa form is attached · 123 m away