700 Marc Taylor Dr
Austin, TX 78745
700 Marc Taylor Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 700 Marc Taylor Dr, Austin, TX 78745. The most recent, filed September 13, 2007, covers: “Taylor estates section 1 (smart housing)”.
Compiled from City of Austin records · updated Sep 13, 2007
- Projects
- 1
- 1 filings
- Latest filing
- Sep 13, 2007
- since Sep 13, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 700 Marc Taylor Dr
What is being built at 700 Marc Taylor Dr?
The latest filing (City of Austin case 261291, September 13, 2007) covers taylor estates section 1 (smart housing).
How many permits and filings does 700 Marc Taylor Dr have?
1 filing across 1 project, from September 13, 2007 to September 13, 2007.
Is there other construction near 700 Marc Taylor Dr?
Yes. Nearby filings include 703 Marc Taylor Dr (replacement of an existing water heater change out of ng tanked water heater, Sep 18, 2026); 708 Marc Taylor Dr (foundation repair on a slab foundation. install 7 total press piling pier locations along the perimeter. there will be 4 breakthrough and patched locations. we will improve level, Jun 30, 2026); 707 Marc Taylor Dr (replacement of complete existing central heat and air system with or without duct work, Aug 15, 2024).
How do I get alerts for new permits at 700 Marc Taylor Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 703 Marc Taylor DrSep 18, 2026Replacement of an existing water heater change out of ng tanked water heater · 41 m away
- 708 Marc Taylor DrJun 30, 2026Foundation repair on a slab foundation. install 7 total press piling pier locations along the perimeter. there will be 4 breakthrough and patched locations. we will improve level · 56 m away
- 707 Marc Taylor DrAug 15, 2024Replacement of complete existing central heat and air system with or without duct work · 68 m away
- 709 Marc Taylor DrFeb 9, 2026Run 1-1/2 gas line 75 feet from meter to the back yard to serve (1) 650000 btu gas kiln · 82 m away
- 712 Marc Taylor DrMay 1, 2025Replacement of complete existing central heat and air system with or without duct work · 85 m away
- 732 Patchway LnAug 1, 2025Replacement of complete existing central heat and air system with or without duct work · 101 m away
- 740 Patchway LnFeb 14, 2024Replacement of an existing water heater · 102 m away
- 715 Marc Taylor DrJul 7, 2026Installation of ev charger · 122 m away
- 764 Patchway LnDec 29, 2025Express- replace tub to shower 1-piece prefabricated acrylic no electrical work needed replace valve with new shower valve · 133 m away
- 800 Patchway LnSep 26, 2024New waster heater install · 141 m away
- 719 Marc Taylor DrJul 3, 2024Replacement of complete existing central heat and air system with or without duct work · 150 m away
- 8109 Almondsbury LnMar 4, 2026Express: foundation repair · 173 m away