groundranger
Historic · latest filing Dec 2024Residential

804 Cedar Gln

Austin, TX 78745

804 Cedar Gln: 1 project on record

City of Austin lists 1 filing across 1 project at 804 Cedar Gln, Austin, TX 78745. The most recent, filed December 11, 2024, covers: “Replace sewer line”.

Compiled from City of Austin records · updated Dec 11, 2024

Projects
1
1 filings
Latest filing
Dec 11, 2024
since Dec 11, 2024
Largest scope
—
Listed value
—

Permit & project history

1 project
  1. Replace sewer line

    Replace sewer line

    City of Austin permitPlumbing PermitExpired
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 804 Cedar Gln

What is being built at 804 Cedar Gln?

The latest filing (City of Austin permit 2024-155206 PP, December 11, 2024) covers replace sewer line.

How many permits and filings does 804 Cedar Gln have?

1 filing across 1 project, from December 11, 2024 to December 11, 2024.

Is there other construction near 804 Cedar Gln?

Yes. Nearby filings include 805 Cedar Gln (replacement of an existing water heater, Apr 25, 2024); 800 Cedar Gln (interior remodel - home remodel -under house plumbing system replacement -new flooring for the house 1900 sqm -wall and ceiling repair -replace 35x47 window with the same size and same location kitchen remodel -ceiling to be raised 12 -appliances and fixtures will be all same location -hood to run new dedicated wiring and new exhaust duct -new afci outlets per code -4 new recessed ceiling light 1 pendant light and 1 dimmer switch -new cabinetry countertop and tiles master bathroom remodel -frame new shower pan and shampoo niche -fixtures all the same location -install 2 gfci outlets -install 2 recessed light -new cabinets countertops and tiles second floor bathroom remodel -frame new shampoo niche -toilet to be relocated -other bathroom fixtures will stay -install 2 gfci outlets -install 1 recessed light office renovatiom -install walls insulation and ceiling for the new office room -install one electrical outlet on each wall per code -install one ceiling fan/light combo -flooring installation -demolish existing wall section for new windows -install 4 new ac supply grills and extend ductwork and connect to the main hvac system and airhandler bathroom addition -remove existing wall separating the future bathroom space from the living area to create the new layout -install a structural wood beam to support the load-bearing requirements of the removed wall. -frame and install new walls as per plans -install wall tiles cabinets paint walls -install fixtures as per plans master bedroom remodel -extend master bedroom closet as per design layout -install 2 new outlets as per code -install 3 recessed led lights and wirings laundry remodel -remove existing door and create new access door to water heater tank -install new cabinets, Jun 30, 2026); 901 Cedar Gln (upgrade ae meter socket and add a main breaker add ev charger, Sep 16, 2025).

How do I get alerts for new permits at 804 Cedar Gln?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78745
Get alerts for 804 Cedar Gln