804 Cedar Gln
Austin, TX 78745
804 Cedar Gln: 1 project on record
City of Austin lists 1 filing across 1 project at 804 Cedar Gln, Austin, TX 78745. The most recent, filed December 11, 2024, covers: “Replace sewer line”.
Compiled from City of Austin records · updated Dec 11, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 11, 2024
- since Dec 11, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplace sewer line
Replace sewer line
City of Austin permitPlumbing PermitExpired- Record
- 2024-155206 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 804 Cedar Gln
What is being built at 804 Cedar Gln?
The latest filing (City of Austin permit 2024-155206 PP, December 11, 2024) covers replace sewer line.
How many permits and filings does 804 Cedar Gln have?
1 filing across 1 project, from December 11, 2024 to December 11, 2024.
Is there other construction near 804 Cedar Gln?
Yes. Nearby filings include 805 Cedar Gln (replacement of an existing water heater, Apr 25, 2024); 800 Cedar Gln (interior remodel - home remodel -under house plumbing system replacement -new flooring for the house 1900 sqm -wall and ceiling repair -replace 35x47 window with the same size and same location kitchen remodel -ceiling to be raised 12 -appliances and fixtures will be all same location -hood to run new dedicated wiring and new exhaust duct -new afci outlets per code -4 new recessed ceiling light 1 pendant light and 1 dimmer switch -new cabinetry countertop and tiles master bathroom remodel -frame new shower pan and shampoo niche -fixtures all the same location -install 2 gfci outlets -install 2 recessed light -new cabinets countertops and tiles second floor bathroom remodel -frame new shampoo niche -toilet to be relocated -other bathroom fixtures will stay -install 2 gfci outlets -install 1 recessed light office renovatiom -install walls insulation and ceiling for the new office room -install one electrical outlet on each wall per code -install one ceiling fan/light combo -flooring installation -demolish existing wall section for new windows -install 4 new ac supply grills and extend ductwork and connect to the main hvac system and airhandler bathroom addition -remove existing wall separating the future bathroom space from the living area to create the new layout -install a structural wood beam to support the load-bearing requirements of the removed wall. -frame and install new walls as per plans -install wall tiles cabinets paint walls -install fixtures as per plans master bedroom remodel -extend master bedroom closet as per design layout -install 2 new outlets as per code -install 3 recessed led lights and wirings laundry remodel -remove existing door and create new access door to water heater tank -install new cabinets, Jun 30, 2026); 901 Cedar Gln (upgrade ae meter socket and add a main breaker add ev charger, Sep 16, 2025).
How do I get alerts for new permits at 804 Cedar Gln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 805 Cedar GlnApr 25, 2024Replacement of an existing water heater · 46 m away
- 800 Cedar GlnJun 30, 2026Interior remodel - home remodel -under house plumbing system replacement -new flooring for the house 1900 sqm -wall and ceiling repair -replace 35x47 window with the same size and same location kitchen remodel -ceiling to be raised 12 -appliances and fixtures will be all same location -hood to run new dedicated wiring and new exhaust duct -new afci outlets per code -4 new recessed ceiling light 1 pendant light and 1 dimmer switch -new cabinetry countertop and tiles master bathroom remodel -frame new shower pan and shampoo niche -fixtures all the same location -install 2 gfci outlets -install 2 recessed light -new cabinets countertops and tiles second floor bathroom remodel -frame new shampoo niche -toilet to be relocated -other bathroom fixtures will stay -install 2 gfci outlets -install 1 recessed light office renovatiom -install walls insulation and ceiling for the new office room -install one electrical outlet on each wall per code -install one ceiling fan/light combo -flooring installation -demolish existing wall section for new windows -install 4 new ac supply grills and extend ductwork and connect to the main hvac system and airhandler bathroom addition -remove existing wall separating the future bathroom space from the living area to create the new layout -install a structural wood beam to support the load-bearing requirements of the removed wall. -frame and install new walls as per plans -install wall tiles cabinets paint walls -install fixtures as per plans master bedroom remodel -extend master bedroom closet as per design layout -install 2 new outlets as per code -install 3 recessed led lights and wirings laundry remodel -remove existing door and create new access door to water heater tank -install new cabinets · 49 m away
- 901 Cedar GlnSep 16, 2025Upgrade ae meter socket and add a main breaker add ev charger · 54 m away
- 903 Cedar GlnJun 26, 2026Eplan: residential expedited review - addition and remodel to existing 1-story single family res. [3bed 2bath] work to include: interior remodel first floor addition new office new rear patio · 68 m away
- 5504 Salem Walk DrFeb 27, 2025Express: foundation repair - install 18 piers · 85 m away
- 5417 Salem Walk DrApr 14, 2026Replacing sewer piping under home plus some of the sewer yard line · 99 m away
- 909 Cedar GlnNov 5, 2025French/hanson - 39-04815: install new 7.6 kw rooftop solar system to existing residential only using backfed breaker · 125 m away
- 5404 Brompton CirJan 9, 2026Express: wheelchair ramp · 146 m away
- 5409 Salem Walk DrMay 14, 2026Replacement of complete existing central heat and air system with or without duct work · 159 m away
- 5410 Salem Walk DrAug 6, 2026Express: tub to tub replacement in same exact location · 162 m away
- 1000 Cedar GlnMar 4, 2025Installation of main panel upgrade of 225a and 125 a · 173 m away
- 1016 W Stassney LnJan 3, 2024Remove and replace deteriorating supports on building 2 stair landing · 179 m away