groundranger
Historic · latest filing Apr 2024Residential

805 Cedar Gln

Austin, TX 78745

805 Cedar Gln: 1 project on record

City of Austin lists 1 filing across 1 project at 805 Cedar Gln, Austin, TX 78745. The most recent, filed April 25, 2024, covers: “Replacement of an existing water heater”.

Compiled from City of Austin records · updated Apr 25, 2024

Projects
1
1 filings
Latest filing
Apr 25, 2024
since Apr 25, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of an existing water heater

  1. AppliedApr 24, 2024
  2. IssuedApr 25, 2024
  3. WorkApr '24 – May '24
  4. Final inspectionMay 13, 2024

Passed final inspection May 13, 2024.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Replacement of an existing water heater

    Replacement of an existing water heater

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 805 Cedar Gln

What is being built at 805 Cedar Gln?

The latest filing (City of Austin permit 2024-050982 PP, April 25, 2024) covers replacement of an existing water heater.

How many permits and filings does 805 Cedar Gln have?

1 filing across 1 project, from April 25, 2024 to April 25, 2024.

Is there other construction near 805 Cedar Gln?

Yes. Nearby filings include 901 Cedar Gln (upgrade ae meter socket and add a main breaker add ev charger, Sep 16, 2025); 804 Cedar Gln (replace sewer line, Dec 11, 2024); 800 Cedar Gln (interior remodel - home remodel -under house plumbing system replacement -new flooring for the house 1900 sqm -wall and ceiling repair -replace 35x47 window with the same size and same location kitchen remodel -ceiling to be raised 12 -appliances and fixtures will be all same location -hood to run new dedicated wiring and new exhaust duct -new afci outlets per code -4 new recessed ceiling light 1 pendant light and 1 dimmer switch -new cabinetry countertop and tiles master bathroom remodel -frame new shower pan and shampoo niche -fixtures all the same location -install 2 gfci outlets -install 2 recessed light -new cabinets countertops and tiles second floor bathroom remodel -frame new shampoo niche -toilet to be relocated -other bathroom fixtures will stay -install 2 gfci outlets -install 1 recessed light office renovatiom -install walls insulation and ceiling for the new office room -install one electrical outlet on each wall per code -install one ceiling fan/light combo -flooring installation -demolish existing wall section for new windows -install 4 new ac supply grills and extend ductwork and connect to the main hvac system and airhandler bathroom addition -remove existing wall separating the future bathroom space from the living area to create the new layout -install a structural wood beam to support the load-bearing requirements of the removed wall. -frame and install new walls as per plans -install wall tiles cabinets paint walls -install fixtures as per plans master bedroom remodel -extend master bedroom closet as per design layout -install 2 new outlets as per code -install 3 recessed led lights and wirings laundry remodel -remove existing door and create new access door to water heater tank -install new cabinets, Jun 30, 2026).

How do I get alerts for new permits at 805 Cedar Gln?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78745
Email me when a new permit is filed