901 Cedar Gln
Austin, TX 78745
901 Cedar Gln: 1 project on record
City of Austin lists 1 filing across 1 project at 901 Cedar Gln, Austin, TX 78745. The most recent, filed September 16, 2025, covers: “Upgrade ae meter socket and add a main breaker add ev charger”.
Compiled from City of Austin records · updated Sep 16, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 16, 2025
- since Sep 16, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledUpgrade ae meter socket and add a main breaker add ev charger
- AppliedSep 12, 2025
- IssuedSep 16, 2025
- WorkSep '25 – Oct '25
- Final inspectionOct 24, 2025
Passed final inspection Oct 24, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectUpgrade ae meter socket and add a main breaker add ev charger
Upgrade ae meter socket and add a main breaker add ev charger
City of Austin permitElectrical PermitFinal- Record
- 2025-116106 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 901 Cedar Gln
What is being built at 901 Cedar Gln?
The latest filing (City of Austin permit 2025-116106 EP, September 16, 2025) covers upgrade ae meter socket and add a main breaker add ev charger.
How many permits and filings does 901 Cedar Gln have?
1 filing across 1 project, from September 16, 2025 to September 16, 2025.
Is there other construction near 901 Cedar Gln?
Yes. Nearby filings include 903 Cedar Gln (eplan: residential expedited review - addition and remodel to existing 1-story single family res. [3bed 2bath] work to include: interior remodel first floor addition new office new rear patio, Jun 26, 2026); 805 Cedar Gln (replacement of an existing water heater, Apr 25, 2024); 804 Cedar Gln (replace sewer line, Dec 11, 2024).
How do I get alerts for new permits at 901 Cedar Gln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 903 Cedar GlnJun 26, 2026Eplan: residential expedited review - addition and remodel to existing 1-story single family res. [3bed 2bath] work to include: interior remodel first floor addition new office new rear patio · 24 m away
- 805 Cedar GlnApr 25, 2024Replacement of an existing water heater · 42 m away
- 804 Cedar GlnDec 11, 2024Replace sewer line · 54 m away
- 909 Cedar GlnNov 5, 2025French/hanson - 39-04815: install new 7.6 kw rooftop solar system to existing residential only using backfed breaker · 88 m away
- 800 Cedar GlnJun 30, 2026Interior remodel - home remodel -under house plumbing system replacement -new flooring for the house 1900 sqm -wall and ceiling repair -replace 35x47 window with the same size and same location kitchen remodel -ceiling to be raised 12 -appliances and fixtures will be all same location -hood to run new dedicated wiring and new exhaust duct -new afci outlets per code -4 new recessed ceiling light 1 pendant light and 1 dimmer switch -new cabinetry countertop and tiles master bathroom remodel -frame new shower pan and shampoo niche -fixtures all the same location -install 2 gfci outlets -install 2 recessed light -new cabinets countertops and tiles second floor bathroom remodel -frame new shampoo niche -toilet to be relocated -other bathroom fixtures will stay -install 2 gfci outlets -install 1 recessed light office renovatiom -install walls insulation and ceiling for the new office room -install one electrical outlet on each wall per code -install one ceiling fan/light combo -flooring installation -demolish existing wall section for new windows -install 4 new ac supply grills and extend ductwork and connect to the main hvac system and airhandler bathroom addition -remove existing wall separating the future bathroom space from the living area to create the new layout -install a structural wood beam to support the load-bearing requirements of the removed wall. -frame and install new walls as per plans -install wall tiles cabinets paint walls -install fixtures as per plans master bedroom remodel -extend master bedroom closet as per design layout -install 2 new outlets as per code -install 3 recessed led lights and wirings laundry remodel -remove existing door and create new access door to water heater tank -install new cabinets · 92 m away
- 5504 Salem Walk DrFeb 27, 2025Express: foundation repair - install 18 piers · 113 m away
- 5417 Salem Walk DrApr 14, 2026Replacing sewer piping under home plus some of the sewer yard line · 123 m away
- 1016 W Stassney LnJan 3, 2024Remove and replace deteriorating supports on building 2 stair landing · 129 m away
- 1000 Cedar GlnMar 4, 2025Installation of main panel upgrade of 225a and 125 a · 152 m away
- 5409 Salem Walk DrMay 14, 2026Replacement of complete existing central heat and air system with or without duct work · 158 m away
- 5410 Salem Walk DrAug 6, 2026Express: tub to tub replacement in same exact location · 165 m away
- 1005 Cedar GlnApr 9, 2026Replacement of complete existing central heat and air system with or without duct work · 176 m away