2308 Matador Cir
Austin, TX 78746
Electrical service rebuild permitted at 2308 Matador Cir
A rebuild of the main electrical service, including a 350-amp main breaker, was permitted at 2308 Matador Cir on November 5, 2026. The City of Austin permit is active.
Summarized from City of Austin records · updated Nov 5, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 5, 2026
- since Nov 5, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayRebuild the main electrical service 350-amp main breaker
- AppliedJan 9, 2026
- IssuedNov 5, 2026
- WorkNov '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectRebuild the main electrical service 350-amp main breaker
Rebuild the main electrical service 350-amp main breaker
City of Austin permitElectrical PermitActive- Record
- 2026-003256 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2308 Matador Cir
What is being built at 2308 Matador Cir?
A City of Austin electrical permit covers rebuilding the main electrical service with a 350-amp main breaker.
When was the electrical work at 2308 Matador Cir permitted?
The permit was filed on November 5, 2026.
What does permit 2026-003256 EP cover?
It covers rebuilding the main electrical service and installing a 350-amp main breaker.
Is a new home being built at 2308 Matador Cir?
The available City of Austin record is for electrical service work; it does not list a new home construction project.
Is the permit for 2308 Matador Cir active?
Yes. Permit 2026-003256 EP is listed as active.
Also being built nearby
All of 78746- 2324 Matador CirSep 30, 2025**austin 2-mile etj** replacement of an existing water heater standard 50 gal electric water heater.. 2324 matador circle austin tx 78746 · 108 m away
- 2320 Matador CirJan 18, 2024Emergency riser pole repair.emergency repair work completed · 126 m away
- 2106 N Oak Canyon RdAug 5, 2025Disconnect reconnect to clean service feeders · 134 m away
- 2400 Trail Of MadronesNov 12, 2026Base: 2 ess installing 2 backup battery systems and additional meter socket. -updated per ae 10/6/26 note: this is not a typical regular base installation in the front of meter program. pilot installation with a second disconnect and ess unit installed to a second main panel · 148 m away
- 1103 Ridgecrest DrAug 22, 20171103 ridgecrest drive · 178 m away
- 2419 Trail Of MadronesOct 6, 2026200 amp panel 200amp meter base grounding · 219 m away
- 2401 Deer PassNov 14, 2026Base: installing a backup battery system and additional meter socket · 228 m away
- 2108 Paisano RdOct 28, 20244.2kw rooftop solar expansion · 268 m away
- 2600 Slow Turtle CvNov 17, 2026Etj - base: installing a backup battery system and additional meter socket · 290 m away
- 2405 Deer PassSep 23, 2024Irrigation system · 297 m away
- 2003 Paisano RdDec 18, 2023Request to disconnect - install transfer switch · 329 m away
- 5109 Quail RunFeb 2, 2009Westlake highlands, amended plat of lots 3 & 4 block 3 — westlake highlands, block 3 lots 3 & 4 amended plat · 360 m away