groundranger
Active · latest filing Nov 2026Residential

2400 Trail Of Madrones

Austin, TX 78746

Backup battery systems permitted at 2400 Trail Of Madrones

City of Austin permits indicate battery storage work at this residence, including two backup battery systems and an additional meter socket. The latest electrical permit, 2026-127492 EP, was filed November 12, 2026, and is active; an earlier battery permit, 2026-043154 EP, was filed September 9, 2026, and is final.

Summarized from City of Austin records · updated Nov 12, 2026

Projects
3
3 filings
Latest filing
Nov 12, 2026
since May 31, 2024
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Base: 2 ess installing 2 backup battery systems and additional meter socket. -updated per ae 10/6/26 note: this is not a typical regular base installation in the front of meter program. pilot installation with a second disconnect and ess unit installed to a second main panel

  1. AppliedSep 28, 2026
  2. IssuedNov 12, 2026
  3. WorkNov '26 – May '27
  4. Final inspection
4% through of the permit windowNov 12, 2026 → May 11, 2027

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Base: 2 ess installing 2 backup battery systems and additional meter socket. -updated per ae 10/6/26 note: this is not a typical regular base installation in the front of meter program. pilot installation with a second disconnect and ess unit installed to a second main panel

    Base: 2 ess installing 2 backup battery systems and additional meter socket. -updated per ae 10/6/26 note: this is not a typical regular base installation in the front of meter program. pilot installation with a second disconnect and ess unit installed to a second main panel

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. We want to install a battery at this residence. we will be installing downstream of main service disconnect

    We want to install a battery at this residence. we will be installing downstream of main service disconnect

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. New irrigation system

    New irrigation system

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2400 Trail Of Madrones

What is being installed at 2400 Trail Of Madrones?

City of Austin permit records describe battery storage work at the residence, including two backup battery systems and an additional meter socket.

When was the battery work permitted at 2400 Trail Of Madrones?

The first listed battery permit, 2026-043154 EP, was filed September 9, 2026. A later permit, 2026-127492 EP, was filed November 12, 2026.

Is the battery installation permit at 2400 Trail Of Madrones active?

Permit 2026-127492 EP is listed as active. The earlier battery permit, 2026-043154 EP, is listed as final.

What does permit 2026-127492 EP cover?

The permit describes a pilot installation with two energy storage systems, a second disconnect, an additional meter socket, and an energy storage unit connected to a second main panel.

Do the permits for 2400 Trail Of Madrones mention solar panels?

The listed permit descriptions mention battery systems and electrical work, but do not mention solar panels.

Was other work permitted at 2400 Trail Of Madrones?

A City of Austin plumbing permit filed May 31, 2024, covers a new irrigation system. It is listed as final.

Also being built nearby

All of 78746
Email me when it passes final inspection