2324 Matador Cir
Austin, TX 78746
2324 Matador Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 2324 Matador Cir, Austin, TX 78746. The most recent, filed September 30, 2025, covers: “**austin 2-mile etj** replacement of an existing water heater standard 50 gal electric water heater.. 2324 matador circle austin tx 78746”.
Compiled from City of Austin records · updated Sep 30, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 30, 2025
- since Sep 30, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit withdrawn**austin 2-mile etj** replacement of an existing water heater standard 50 gal electric water heater.. 2324 matador circle austin tx 78746
- AppliedSep 29, 2025
- IssuedSep 30, 2025
- !WorkSep '25 – Mar '26
- Final inspection
Marked withdrawn Oct 23, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 project**austin 2-mile etj** replacement of an existing water heater standard 50 gal electric water heater.. 2324 matador circle austin tx 78746
**austin 2-mile etj** replacement of an existing water heater standard 50 gal electric water heater.. 2324 matador circle austin tx 78746
City of Austin permitPlumbing PermitWithdrawn- Record
- 2025-123469 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2324 Matador Cir
What is being built at 2324 Matador Cir?
The latest filing (City of Austin permit 2025-123469 PP, September 30, 2025) covers **austin 2-mile etj** replacement of an existing water heater standard 50 gal electric water heater.. 2324 matador circle austin tx 78746.
How many permits and filings does 2324 Matador Cir have?
1 filing across 1 project, from September 30, 2025 to September 30, 2025.
Is there other construction near 2324 Matador Cir?
Yes. Nearby filings include 2320 Matador Cir (emergency riser pole repair.emergency repair work completed, Jan 18, 2024); 2400 Trail Of Madrones (base: 2 ess installing 2 backup battery systems and additional meter socket. -updated per ae 10/6/26 note: this is not a typical regular base installation in the front of meter program. pilot installation with a second disconnect and ess unit installed to a second main panel, Nov 12, 2026); 2308 Matador Cir (rebuild the main electrical service 350-amp main breaker, Nov 5, 2026).
How do I get alerts for new permits at 2324 Matador Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78746- 2320 Matador CirJan 18, 2024Emergency riser pole repair.emergency repair work completed · 57 m away
- 2400 Trail Of MadronesNov 12, 2026Base: 2 ess installing 2 backup battery systems and additional meter socket. -updated per ae 10/6/26 note: this is not a typical regular base installation in the front of meter program. pilot installation with a second disconnect and ess unit installed to a second main panel · 92 m away
- 2308 Matador CirNov 5, 2026Rebuild the main electrical service 350-amp main breaker · 108 m away
- 2106 N Oak Canyon RdAug 5, 2025Disconnect reconnect to clean service feeders · 161 m away
- 2419 Trail Of MadronesOct 6, 2026200 amp panel 200amp meter base grounding · 174 m away
- 2600 Slow Turtle CvNov 17, 2026Etj - base: installing a backup battery system and additional meter socket · 205 m away
- 1103 Ridgecrest DrAug 22, 20171103 ridgecrest drive · 262 m away
- 2401 Deer PassNov 14, 2026Base: installing a backup battery system and additional meter socket · 287 m away
- 2504 Toro Canyon RdJul 25, 2024Rebuild a 200 amp service that got burned · 317 m away
- 2405 Deer PassSep 23, 2024Irrigation system · 340 m away
- 2108 Paisano RdOct 28, 20244.2kw rooftop solar expansion · 361 m away
- 4709 Christopher DrAug 18, 2026Base: installing a backup battery system and additional meter socket · 367 m away