6315 Ken Caryl Dr
Austin, TX 78747
6315 Ken Caryl Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 6315 Ken Caryl Dr, Austin, TX 78747 since February 22, 2025. The most recent, filed March 24, 2025, covers: “Replace front yard sewer line from house to street connection”.
Compiled from City of Austin records · updated Mar 24, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Mar 24, 2025
- since Feb 22, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace front yard sewer line from house to street connection
- AppliedMar 18, 2025
- IssuedMar 24, 2025
- WorkMar '25 – Apr '25
- Final inspectionApr 3, 2025
Passed final inspection Apr 3, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplace front yard sewer line from house to street connection
Replace front yard sewer line from house to street connection
City of Austin permitPlumbing PermitFinal- Record
- 2025-032427 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace 6 ceiling fans and 5 outlets
Replace 6 ceiling fans and 5 outlets
City of Austin permitElectrical PermitFinal- Record
- 2025-016553 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6315 Ken Caryl Dr
What is being built at 6315 Ken Caryl Dr?
The latest filing (City of Austin permit 2025-032427 PP, March 24, 2025) covers replace front yard sewer line from house to street connection.
How many permits and filings does 6315 Ken Caryl Dr have?
2 filings across 2 projects, from February 22, 2025 to March 24, 2025.
What is being built near City Of Austin Parks And Recreation Department in Austin?
6315 Ken Caryl Dr is about 198 m from City Of Austin Parks And Recreation Department (8022 Thazton Road). Its latest filing is for replace front yard sewer line from house to street connection.
Is there other construction near 6315 Ken Caryl Dr?
Yes. Nearby filings include 6313 Ken Caryl Dr (replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton vertical heat pump, Aug 31, 2026); 8101 Verbank Villa Dr (pv charger installation: proposed installation is installing a new 60-amp circuit in the 200-amp msp and route wiring directly behind and to the right interior garage wall... hard wire the chargepoint home flex- j1772 and configure to draw up to 48 a continuous, Jul 18, 2026); 8105 Verbank Villa Dr (replacement of an existing water heater replace existing water heater at 8105 verbank villa 78717, Sep 25, 2026).
How do I get alerts for new permits at 6315 Ken Caryl Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78747- 6313 Ken Caryl DrAug 31, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton vertical heat pump · 16 m away
- 8101 Verbank Villa DrJul 18, 2026Pv charger installation: proposed installation is installing a new 60-amp circuit in the 200-amp msp and route wiring directly behind and to the right interior garage wall... hard wire the chargepoint home flex- j1772 and configure to draw up to 48 a continuous · 97 m away
- 8105 Verbank Villa DrSep 25, 2026Replacement of an existing water heater replace existing water heater at 8105 verbank villa 78717 · 117 m away
- 8010 Bannock LnFeb 3, 2009Springfield ph b sec 5, amended plat of lots 9 & 10 block i (smart housing) — springfield phase b sec 5, amended plat of lots 9 and 10 block i (smart housing) · 119 m away
- 8022 Thaxton RdSep 25, 2026Pard - grand meadow neighborhood park · 123 m away
- 8107 Verbank Villa DrFeb 25, 2026Replace interior hot and cold water lines with uponor pex pipe. replace main water line from city lead to home · 131 m away
- 7930 Thaxton RdSep 11, 2025Eplan-expedited review: [approved] first time finish out for retail outlet (930 sq ft) · 132 m away
- 8009 Bannock LnJun 3, 2024Replacement of complete existing central heat and air system with or without duct work · 137 m away
- 6211 Ken Caryl DrSep 8, 2026Replacement of an existing water heater 50 gallon electric water heater replacement · 162 m away
- 8108 Verbank Villa DrJul 22, 2026Express: tub to shower conversion in master bath · 174 m away
- 8106 Verbank Villa DrAug 4, 2026Express: reroofing · 174 m away
- 8022 Thazton Road · City Of Austin Parks And Recreation DepartmentJan 27, 2025Grand meadow neighborhood park-phase 1 — new construction — phase 1-new city neighborhood park, walking trail, amenities. 9.93 acres · 198 m away