8108 Verbank Villa Dr
Austin, TX 78747
Bathroom and home-system updates at 8108 Verbank Villa Dr
Austin permits cover a tub-to-shower conversion and other home updates at 8108 Verbank Villa Dr. The records include work permitted on December 11, 2025, and July 22, 2026; they describe renovations rather than a new building.
Summarized from City of Austin records · updated Jul 22, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Jul 22, 2026
- since Dec 11, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: tub to shower conversion in master bath
- AppliedJul 17, 2026
- IssuedJul 22, 2026
- WorkJul '26 – Sep '26
- Final inspectionSep 1, 2026
Passed final inspection Sep 1, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
6 projectsExpress: tub to shower conversion in master bath
Express: tub to shower conversion in master bath
City of Austin permitBuilding PermitFinal- Record
- 2026-094217 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: tub to shower conversion in master bath
Express: tub to shower conversion in master bath
City of Austin permitPlumbing PermitFinal- Record
- 2026-094217 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: replace water heater replace exterior outlets with gfcis tub to shower replace smoke detectors
Express: replace water heater replace exterior outlets with gfcis tub to shower replace smoke detectors
City of Austin permitPlumbing PermitFinal- Record
- 2025-156581 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: replace water heater replace exterior outlets with gfcis tub to shower replace smoke detectors
Express: replace water heater replace exterior outlets with gfcis tub to shower replace smoke detectors
City of Austin permitBuilding PermitFinal- Record
- 2025-156581 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: replace water heater replace exterior outlets with gfcis tub to shower replace smoke detectors
Express: replace water heater replace exterior outlets with gfcis tub to shower replace smoke detectors
City of Austin permitElectrical PermitFinal- Record
- 2025-156581 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install prv on water line
Install prv on water line
City of Austin permitPlumbing PermitFinal- Record
- 2023-050921 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8108 Verbank Villa Dr
What is being built at 8108 Verbank Villa Dr?
City of Austin permits describe home updates, including a tub-to-shower conversion, rather than new construction.
Is a bathroom renovation planned at 8108 Verbank Villa Dr?
Permits dated July 22, 2026, cover converting a tub to a shower in the master bath. The building permit is 2026-094217 BP, and the plumbing permit is 2026-094217 PP.
What work was permitted at 8108 Verbank Villa Dr in December 2025?
Permits filed December 11, 2025, cover replacing a water heater, replacing exterior outlets with GFCIs, converting a tub to a shower, and replacing smoke detectors. The records are 2025-156581 BP, PP, and EP.
Are the permits for 8108 Verbank Villa Dr finalized?
The five City of Austin permits in the record are marked Final. They were filed on December 11, 2025, and July 22, 2026.
When was the latest work permitted at 8108 Verbank Villa Dr?
The latest listed permits were filed July 22, 2026, for a master-bath tub-to-shower conversion.
Also being built nearby
All of 78747- 8106 Verbank Villa DrAug 4, 2026Express: reroofing · 18 m away
- 8107 Verbank Villa DrFeb 25, 2026Replace interior hot and cold water lines with uponor pex pipe. replace main water line from city lead to home · 47 m away
- 8105 Verbank Villa DrSep 25, 2026Replacement of an existing water heater replace existing water heater at 8105 verbank villa 78717 · 57 m away
- 8101 Salt Springs DrSep 24, 2024C3 canopy elevation reface. signs to be switched like for like · 69 m away
- 6211 Ken Caryl DrSep 8, 2026Replacement of an existing water heater 50 gallon electric water heater replacement · 73 m away
- 8101 Verbank Villa DrJul 18, 2026Pv charger installation: proposed installation is installing a new 60-amp circuit in the 200-amp msp and route wiring directly behind and to the right interior garage wall... hard wire the chargepoint home flex- j1772 and configure to draw up to 48 a continuous · 81 m away
- 7930 Thaxton RdSep 11, 2025Eplan-expedited review: [approved] first time finish out for retail outlet (930 sq ft) · 102 m away
- 6206 Ken Caryl DrSep 28, 2026Replacement of complete existing central heat and air system with or without duct work orr · 131 m away
- 6313 Ken Caryl DrAug 31, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton vertical heat pump · 159 m away
- 6315 Ken Caryl DrMar 24, 2025Replace front yard sewer line from house to street connection · 174 m away
- 6211 Ringsby RdOct 23, 2024Replacement of an existing water heater · 181 m away
- 8010 Bannock LnFeb 3, 2009Springfield ph b sec 5, amended plat of lots 9 & 10 block i (smart housing) — springfield phase b sec 5, amended plat of lots 9 and 10 block i (smart housing) · 218 m away