EV charger installation permitted at 8101 Verbank Villa Dr

A home EV charger installation was permitted at 8101 Verbank Villa Dr on July 18, 2026. The permit describes a new 60-amp circuit and a hardwired ChargePoint Home Flex charger configured for up to 48 amps continuous.

Summarized from City of Austin records · updated Jul 18, 2026

Projects
2
2 filings
Latest filing
Jul 18, 2026
since Feb 18, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Pv charger installation: proposed installation is installing a new 60-amp circuit in the 200-amp msp and route wiring directly behind and to the right interior garage wall... hard wire the chargepoint home flex- j1772 and configure to draw up to 48 a continuous

  1. AppliedJul 16, 2026
  2. IssuedJul 18, 2026
  3. WorkJul '26 – Jul '26
  4. Final inspectionJul 31, 2026

Passed final inspection Jul 31, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Pv charger installation: proposed installation is installing a new 60-amp circuit in the 200-amp msp and route wiring directly behind and to the right interior garage wall... hard wire the chargepoint home flex- j1772 and configure to draw up to 48 a continuous

    Pv charger installation: proposed installation is installing a new 60-amp circuit in the 200-amp msp and route wiring directly behind and to the right interior garage wall... hard wire the chargepoint home flex- j1772 and configure to draw up to 48 a continuous

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. 10 tunnel below the foundation to repair break on upstairs plumbing stack. 1 access hole on left and spot repair on the yard sewer

    10 tunnel below the foundation to repair break on upstairs plumbing stack. 1 access hole on left and spot repair on the yard sewer

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 8101 Verbank Villa Dr

What is being installed at 8101 Verbank Villa Dr?

A City of Austin electrical permit describes installation of a hardwired ChargePoint Home Flex EV charger. It includes a new 60-amp circuit.

When was the EV charger permit filed?

The permit, 2026-091721 EP, was filed on July 18, 2026, and is listed as final.

How much power will the charger draw?

The permit says the charger is configured to draw up to 48 amps continuously.

Is this a new building project at 8101 Verbank Villa Dr?

The records provided show an EV charger installation, not a new building project.

What other work was permitted at this address?

A plumbing permit dated February 18, 2025, covers repairs to an upstairs plumbing stack and a spot repair to the yard sewer.