8721 Capitol View Dr
Austin, TX 78747
8721 Capitol View Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 8721 Capitol View Dr, Austin, TX 78747. The most recent, filed December 21, 2023, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Dec 21, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 21, 2023
- since Dec 21, 2023
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitExpired- Record
- 2023-161981 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8721 Capitol View Dr
What is being built at 8721 Capitol View Dr?
The latest filing (City of Austin permit 2023-161981 PP, December 21, 2023) covers replacement of an existing water heater.
How many permits and filings does 8721 Capitol View Dr have?
1 filing across 1 project, from December 21, 2023 to December 21, 2023.
Is there other construction near 8721 Capitol View Dr?
Yes. Nearby filings include 8720 Capitol View Dr (drain existing tank and remove water heater. install new rheem 50 gallon electric water heater. install new stainless supply line on hot and cold side. install new supply line in tmp drain, Mar 1, 2026); 8712 Capitol View Dr (replacement of an existing water heater like for like water heater replacement - 50 gallon electric, Nov 13, 2026); 8708 Capitol View Dr (replacement of complete existing central heat and air system with or without duct work replace existing equipment with york lx series heat pump, Oct 9, 2025).
How do I get alerts for new permits at 8721 Capitol View Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78747- 8720 Capitol View DrMar 1, 2026Drain existing tank and remove water heater. install new rheem 50 gallon electric water heater. install new stainless supply line on hot and cold side. install new supply line in tmp drain · 36 m away
- 8712 Capitol View DrNov 13, 2026Replacement of an existing water heater like for like water heater replacement - 50 gallon electric · 50 m away
- 8708 Capitol View DrOct 9, 2025Replacement of complete existing central heat and air system with or without duct work replace existing equipment with york lx series heat pump · 61 m away
- 8805 Capitol View DrOct 9, 2026Base: installing a backup battery system and additional meter socket · 71 m away
- 8717 Panadero DrJan 28, 2026Express - foundation repair on a slab foundation. intend to install 27 total press piling piers along the perimeter. there will be 9 breakthrough and patched locations. we will improve level to the extent · 82 m away
- 8713 Panadero DrAug 29, 2025Replacement of complete existing central heat and air system with or without duct work · 87 m away
- 8709 Panadero DrJul 29, 2025Express: perform foundation repair by installing 14 concrete pressed pilings. additionally repair the drain line on the right side by performing a spot repair through the garage slab approximately 5 feet in length · 94 m away
- 8901 Ridgewell RdApr 1, 2026Express: foundation repair · 98 m away
- 8808 Capitol View DrMar 2, 2022Dannelly plat project assessment · 99 m away
- 6600 Baythorne DrApr 17, 2024Install monument sign. mckinney park. east/west elevation · 100 m away
- 8801 Panadero DrJun 9, 2025Installing a new irrigation system · 102 m away
- 8812 Capitol View DrMay 13, 2026Express: replace 7 windows like for like · 112 m away