8901 Ridgewell Rd
Austin, TX 78747
Foundation repair permitted at 8901 Ridgewell Rd
A City of Austin permit at 8901 Ridgewell Rd covers foundation repair. The permit, 2026-038383 BP, was filed April 1, 2026, and its status is Final.
Summarized from City of Austin records · updated Apr 1, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 1, 2026
- since Apr 1, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectExpress: foundation repair
Express: foundation repair
City of Austin permitBuilding PermitFinal- Record
- 2026-038383 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8901 Ridgewell Rd
What is being built at 8901 Ridgewell Rd in Austin?
The City of Austin permit describes foundation repair, not a new building. Permit 2026-038383 BP was filed April 1, 2026.
Is a new home being built at 8901 Ridgewell Rd?
The available permit record is for foundation repair; it does not describe new-home construction.
What does permit 2026-038383 BP cover?
Its description is “Express: foundation repair.” The City of Austin listed the permit as Final.
When was foundation repair permitted at 8901 Ridgewell Rd?
The permit was filed April 1, 2026.
Is the foundation repair permit at 8901 Ridgewell Rd final?
Yes. The City of Austin record lists permit 2026-038383 BP as Final.
Also being built nearby
All of 78747- 6600 Baythorne DrApr 17, 2024Install monument sign. mckinney park. east/west elevation · 74 m away
- 8805 Capitol View DrOct 9, 2026Base: installing a backup battery system and additional meter socket · 82 m away
- 8721 Capitol View DrDec 21, 2023Replacement of an existing water heater · 98 m away
- 9021 Bird Brook LnOct 3, 2025Install new 8.500 kw rooftop solar system for existing residential only · 100 m away
- 8817 Capitol View DrMar 6, 2024Replacement of an existing water heater · 106 m away
- 9009 Ridgewell RdJun 2, 2026Express: foundation repair revision-plumbing work (repair sewer line underneath home) · 119 m away
- 8808 Capitol View DrMar 2, 2022Dannelly plat project assessment · 126 m away
- 8720 Capitol View DrMar 1, 2026Drain existing tank and remove water heater. install new rheem 50 gallon electric water heater. install new stainless supply line on hot and cold side. install new supply line in tmp drain · 130 m away
- 8812 Capitol View DrMay 13, 2026Express: replace 7 windows like for like · 132 m away
- 6625 Ashen LnNov 9, 2026Express- existing foundation repair as per scope of work attached drawing · 133 m away
- 9012 Ridgewell RdSep 2, 2025Replacement of complete existing central heat and air system with or without duct work · 138 m away
- 8712 Capitol View DrNov 13, 2026Replacement of an existing water heater like for like water heater replacement - 50 gallon electric · 148 m away