8808 Capitol View Dr
Austin, TX 78747
8808 Capitol View Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 8808 Capitol View Dr, Austin, TX 78747. The most recent, filed March 2, 2022, covers: “Dannelly plat project assessment”.
Compiled from City of Austin records · updated Mar 2, 2022
- Projects
- 1
- 1 filings
- Latest filing
- Mar 2, 2022
- since Mar 2, 2022
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 8808 Capitol View Dr
What is being built at 8808 Capitol View Dr?
The latest filing (City of Austin case 12462679, March 2, 2022) covers dannelly plat project assessment.
How many permits and filings does 8808 Capitol View Dr have?
1 filing across 1 project, from March 2, 2022 to March 2, 2022.
Is there other construction near 8808 Capitol View Dr?
Yes. Nearby filings include 8812 Capitol View Dr (express: replace 7 windows like for like, May 13, 2026); 8817 Capitol View Dr (replacement of an existing water heater, Mar 6, 2024); 8805 Capitol View Dr (base: installing a backup battery system and additional meter socket, Oct 9, 2026).
How do I get alerts for new permits at 8808 Capitol View Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78747- 8812 Capitol View DrMay 13, 2026Express: replace 7 windows like for like · 13 m away
- 8817 Capitol View DrMar 6, 2024Replacement of an existing water heater · 44 m away
- 8805 Capitol View DrOct 9, 2026Base: installing a backup battery system and additional meter socket · 45 m away
- 8801 Panadero DrJun 9, 2025Installing a new irrigation system · 59 m away
- 6428 Kedington StMar 23, 202610 tunnel below the foundation to repair the master bath drain line and repair broken cleanout · 91 m away
- 8720 Capitol View DrMar 1, 2026Drain existing tank and remove water heater. install new rheem 50 gallon electric water heater. install new stainless supply line on hot and cold side. install new supply line in tmp drain · 92 m away
- 8721 Capitol View DrDec 21, 2023Replacement of an existing water heater · 99 m away
- 8717 Panadero DrJan 28, 2026Express - foundation repair on a slab foundation. intend to install 27 total press piling piers along the perimeter. there will be 9 breakthrough and patched locations. we will improve level to the extent · 119 m away
- 8724 Panadero DrJan 7, 2026Did spot repair to repair kitchen drain used 2 pipe and the tunnel was 9 · 123 m away
- 8901 Ridgewell RdApr 1, 2026Express: foundation repair · 126 m away
- 8712 Capitol View DrNov 13, 2026Replacement of an existing water heater like for like water heater replacement - 50 gallon electric · 126 m away
- 8713 Panadero DrAug 29, 2025Replacement of complete existing central heat and air system with or without duct work · 133 m away