3012 Jubilee Trl
Austin, TX 78748
Drain repiping tunnel permitted at 3012 Jubilee Trl
A 100-foot tunnel for repiping drains under the foundation was permitted at 3012 Jubilee Trl on March 30, 2026. The City of Austin plumbing permit, 2026-036582 PP, is marked final.
Summarized from City of Austin records · updated Mar 30, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 30, 2026
- since Mar 30, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled100ft tunnel to repipe drains under foundation
- AppliedMar 26, 2026
- IssuedMar 30, 2026
- WorkMar '26 – May '26
- Final inspectionMay 13, 2026
Passed final inspection May 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 project100ft tunnel to repipe drains under foundation
100ft tunnel to repipe drains under foundation
City of Austin permitPlumbing PermitFinal- Record
- 2026-036582 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3012 Jubilee Trl
What work is permitted at 3012 Jubilee Trl?
A City of Austin plumbing permit covers a 100-foot tunnel to repipe drains under the foundation.
When was the plumbing permit for 3012 Jubilee Trl filed?
The permit was filed on March 30, 2026.
What is the permit number for work at 3012 Jubilee Trl?
The permit number is 2026-036582 PP. It is listed as a plumbing permit and marked final.
Is a new building planned at 3012 Jubilee Trl?
The available record describes drain repiping under the foundation, not construction of a new building.
Is foundation work happening near 3012 Jubilee Trl?
Nearby records include a permit at 3014 Jubilee Trl to expose and repair waste piping below the slab using a tunnel, filed April 22, 2026.
Also being built nearby
All of 78748- 3014 Jubilee TrlApr 22, 2026Expose and repair waste piping below the slab with the use of a tunnel · 17 m away
- 3016 Jubilee TrlJul 31, 2024Replace existing austin energy meter socket. install a new austin energy meter socket and add a main breaker · 33 m away
- 3011 Foxton CvApr 9, 2026Express: foundation repair · 38 m away
- 3013 Foxton CvSep 15, 2025Repairing meter conduit. no meter work or service change · 43 m away
- 3013 Jubilee TrlJul 30, 2024Replacement of complete existing central heat and air system with or without duct work · 53 m away
- 3015 Foxton CvNov 11, 202640 ft new main water line · 54 m away
- 3015 Jubilee TrlAug 22, 2024Replacement of complete existing central heat and air system with or without duct work · 62 m away
- 3020 Jubilee TrlOct 29, 2025Express: foundation repair · 64 m away
- 10100 Ivanhoe TrlJul 9, 2026Replacement of complete existing central heat and air system with or without duct work **steve serna: replace existing 2.5-ton vertical gas split system like-for-like; no structural change · 86 m away
- 3012 Foxton CvSep 1, 2026Replacement of an existing water heater replacement of a 50 gallon natural gas water heater in the garage · 89 m away
- 3014 Foxton CvFeb 28, 2024Express: foundation repair-install 17 piers interior and exterior break outs · 95 m away
- 3012 Rochelle DrJan 29, 202638 tunnel below the foundation to repair breaks on the master bathroom hall bathroom kitchen and on building drain upstream of clean out drain line using the current access hole · 102 m away