3013 Jubilee Trl
Austin, TX 78748
3013 Jubilee Trl: 2 projects on record
City of Austin lists 2 filings across 2 projects at 3013 Jubilee Trl, Austin, TX 78748 since May 23, 2024. The most recent, filed July 30, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jul 30, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Jul 30, 2024
- since May 23, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedJul 29, 2024
- IssuedJul 30, 2024
- WorkJul '24 – Nov '24
- Final inspectionNov 18, 2024
Passed final inspection Nov 18, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-094983 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-065016 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3013 Jubilee Trl
What is being built at 3013 Jubilee Trl?
The latest filing (City of Austin permit 2024-094983 MP, July 30, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 3013 Jubilee Trl have?
2 filings across 2 projects, from May 23, 2024 to July 30, 2024.
Is there other construction near 3013 Jubilee Trl?
Yes. Nearby filings include 3015 Jubilee Trl (replacement of complete existing central heat and air system with or without duct work, Aug 22, 2024); 3016 Jubilee Trl (replace existing austin energy meter socket. install a new austin energy meter socket and add a main breaker, Jul 31, 2024); 3014 Jubilee Trl (expose and repair waste piping below the slab with the use of a tunnel, Apr 22, 2026).
How do I get alerts for new permits at 3013 Jubilee Trl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 3015 Jubilee TrlAug 22, 2024Replacement of complete existing central heat and air system with or without duct work · 15 m away
- 3016 Jubilee TrlJul 31, 2024Replace existing austin energy meter socket. install a new austin energy meter socket and add a main breaker · 47 m away
- 3014 Jubilee TrlApr 22, 2026Expose and repair waste piping below the slab with the use of a tunnel · 47 m away
- 10100 Ivanhoe TrlJul 9, 2026Replacement of complete existing central heat and air system with or without duct work **steve serna: replace existing 2.5-ton vertical gas split system like-for-like; no structural change · 52 m away
- 3012 Rochelle DrJan 29, 202638 tunnel below the foundation to repair breaks on the master bathroom hall bathroom kitchen and on building drain upstream of clean out drain line using the current access hole · 52 m away
- 3012 Jubilee TrlMar 30, 2026100ft tunnel to repipe drains under foundation · 53 m away
- 3010 Rochelle DrApr 16, 2026Replacement of an existing water heater we will be replacing the 40gal tank style gas water heater for the same kind · 54 m away
- 3020 Jubilee TrlOct 29, 2025Express: foundation repair · 59 m away
- 3008 Rochelle DrJan 20, 2026Express- foundation repair on a slab foundation. install 36 total press piling piers including 26 perimeter and 16 interior locations. there will be 16 breakthrough and patched locations. improve level to the extent · 63 m away
- 3013 Foxton CvSep 15, 2025Repairing meter conduit. no meter work or service change · 84 m away
- 3015 Foxton CvNov 11, 202640 ft new main water line · 85 m away
- 3011 Foxton CvApr 9, 2026Express: foundation repair · 88 m away