3015 Foxton Cv
Austin, TX 78748
40-foot main water line permitted at 3015 Foxton Cv
A 40-foot new main water line is listed for 3015 Foxton Cv in Austin. The City of Austin issued an active plumbing permit for the work on November 11, 2026 (permit 2026-147997 PP).
Summarized from City of Austin records · updated Nov 11, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 11, 2026
- since Nov 11, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underway40 ft new main water line
- AppliedNov 10, 2026
- IssuedNov 11, 2026
- WorkNov '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 project40 ft new main water line
40 ft new main water line
City of Austin permitPlumbing PermitActive- Record
- 2026-147997 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3015 Foxton Cv
What is being built at 3015 Foxton Cv?
A City of Austin plumbing permit lists a 40-foot new main water line at the address. The permit is active and dated November 11, 2026.
When was the water line permitted at 3015 Foxton Cv?
The permit was filed on November 11, 2026. Its number is 2026-147997 PP.
Is a new home being built at 3015 Foxton Cv?
The record provided is for a 40-foot main water line, not a new home. It does not list a building project.
What does permit 2026-147997 PP cover?
The City of Austin permit describes the work as a 40-foot new main water line. It is classified as a plumbing permit.
Is the 3015 Foxton Cv permit active?
Yes. The City of Austin record lists permit 2026-147997 PP as active.
Also being built nearby
All of 78748- 3013 Foxton CvSep 15, 2025Repairing meter conduit. no meter work or service change · 18 m away
- 3011 Foxton CvApr 9, 2026Express: foundation repair · 37 m away
- 3016 Jubilee TrlJul 31, 2024Replace existing austin energy meter socket. install a new austin energy meter socket and add a main breaker · 38 m away
- 3014 Jubilee TrlApr 22, 2026Expose and repair waste piping below the slab with the use of a tunnel · 43 m away
- 3020 Jubilee TrlOct 29, 2025Express: foundation repair · 45 m away
- 3014 Foxton CvFeb 28, 2024Express: foundation repair-install 17 piers interior and exterior break outs · 50 m away
- 3012 Foxton CvSep 1, 2026Replacement of an existing water heater replacement of a 50 gallon natural gas water heater in the garage · 53 m away
- 3012 Jubilee TrlMar 30, 2026100ft tunnel to repipe drains under foundation · 54 m away
- 3101 Foxton CvMay 14, 2026Mahoney - 39-62289 install new 7.6kw rooftop solar system to existing residential only using backfed breaker only · 80 m away
- 3015 Jubilee TrlAug 22, 2024Replacement of complete existing central heat and air system with or without duct work · 83 m away
- 3013 Jubilee TrlJul 30, 2024Replacement of complete existing central heat and air system with or without duct work · 85 m away
- 3100 Foxton CvFeb 11, 2026Replacement of an existing water heater replace 40-gallon gas water heater located: inside exterior closet · 96 m away