9321 Linkmeadow Dr
Austin, TX 78748
9321 Linkmeadow Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 9321 Linkmeadow Dr, Austin, TX 78748. The most recent, filed February 12, 2025, covers: “Tunnel under home for whole house sewer repipe.aprox 85ft”.
Compiled from City of Austin records · updated Feb 12, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Feb 12, 2025
- since Feb 12, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel under home for whole house sewer repipe.aprox 85ft
- AppliedFeb 5, 2025
- IssuedFeb 12, 2025
- WorkFeb '25 – Feb '25
- Final inspectionFeb 26, 2025
Passed final inspection Feb 26, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel under home for whole house sewer repipe.aprox 85ft
Tunnel under home for whole house sewer repipe.aprox 85ft
City of Austin permitPlumbing PermitFinal- Record
- 2025-014080 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9321 Linkmeadow Dr
What is being built at 9321 Linkmeadow Dr?
The latest filing (City of Austin permit 2025-014080 PP, February 12, 2025) covers tunnel under home for whole house sewer repipe.aprox 85ft.
How many permits and filings does 9321 Linkmeadow Dr have?
1 filing across 1 project, from February 12, 2025 to February 12, 2025.
Is there other construction near 9321 Linkmeadow Dr?
Yes. Nearby filings include 9325 Linkmeadow Dr (1 access hole in concrete 15 foot tunnel to repair sewer under slab, Feb 21, 2025); 9313 Linkmeadow Dr (replacement of complete existing central heat and air system with or without duct work, Jun 19, 2025); 9408 Linkmeadow Dr (express- tub to shower replacement (prefab base) in the same location, Jun 8, 2026).
How do I get alerts for new permits at 9321 Linkmeadow Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 9325 Linkmeadow DrFeb 21, 20251 access hole in concrete 15 foot tunnel to repair sewer under slab · 15 m away
- 9313 Linkmeadow DrJun 19, 2025Replacement of complete existing central heat and air system with or without duct work · 30 m away
- 9408 Linkmeadow DrJun 8, 2026Express- tub to shower replacement (prefab base) in the same location · 81 m away
- 9329 Bradner DrSep 16, 2025Repipe from main manifold from behind water heater to behind fridge and to kitchen sink · 92 m away
- 9213 Linkmeadow DrMay 21, 202512 tunnel below the foundation to repair bellied main and 3x2 utility wye. 1 access hole on left and 20 additional linear feet for tunnel below the foundation to repair additional break on utility drain line and spot repair on hall bathroom · 93 m away
- 9212 Linkmeadow DrMay 30, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton 2 stage horizontal gas system · 98 m away
- 9416 Linkmeadow DrOct 6, 2026Tub to shower replacement (prefab base) in the same location · 113 m away
- 9328 Bernoulli DrMar 6, 2026Replacement of an existing water heater replace 40-gallon gas water heater located in garage · 116 m away
- 9205 Linkmeadow DrFeb 11, 2025Express - replace 13 existing windows · 123 m away
- 9421 Linkmeadow DrDec 19, 2023Replace the water heater and cartridge and install flow tech · 123 m away
- 9349 Bernoulli DrJan 14, 2026Replacement of an existing water heater 40gal gas water heater · 127 m away
- 9345 Bernoulli DrAug 2, 2024Replacement of complete existing central heat and air system with or without duct work · 128 m away