9408 Linkmeadow Dr
Austin, TX 78748
Home repairs permitted at 9408 Linkmeadow Dr
City of Austin permits indicate home repairs at 9408 Linkmeadow Dr, rather than new construction. A central heating and air system replacement was permitted March 19, 2024, and tub-to-shower replacement permits were filed June 8, 2026; both 2026 permits are final.
Summarized from City of Austin records · updated Jun 8, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jun 8, 2026
- since Mar 19, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress- tub to shower replacement (prefab base) in the same location
- AppliedJun 5, 2026
- IssuedJun 8, 2026
- WorkJun '26 – Jun '26
- Final inspectionJun 22, 2026
Passed final inspection Jun 22, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsExpress- tub to shower replacement (prefab base) in the same location
Express- tub to shower replacement (prefab base) in the same location
City of Austin permitPlumbing PermitFinal- Record
- 2026-071939 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express- tub to shower replacement (prefab base) in the same location
Express- tub to shower replacement (prefab base) in the same location
City of Austin permitBuilding PermitFinal- Record
- 2026-071939 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-031953 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9408 Linkmeadow Dr
What is being built at 9408 Linkmeadow Dr in Austin?
The City of Austin permit records show home repairs, not a new building: a central heating and air system replacement and a tub-to-shower replacement.
Is there new construction planned at 9408 Linkmeadow Dr?
The available records do not indicate new construction. They describe repairs to the existing home.
What renovation was permitted at 9408 Linkmeadow Dr in 2026?
On June 8, 2026, the city issued building permit 2026-071939 BP and plumbing permit 2026-071939 PP for a tub-to-shower replacement with a prefab base in the same location. Both permits are final.
When was the HVAC replacement permitted at 9408 Linkmeadow Dr?
The City of Austin filed mechanical permit 2024-031953 MP on March 19, 2024, for replacement of the existing central heat and air system, with or without duct work.
Are the permits for 9408 Linkmeadow Dr final?
The two permits filed June 8, 2026, for the tub-to-shower replacement are marked final. The March 19, 2024, mechanical permit is also marked final.
Also being built nearby
All of 78748- 9416 Linkmeadow DrOct 6, 2026Tub to shower replacement (prefab base) in the same location · 34 m away
- 9421 Linkmeadow DrDec 19, 2023Replace the water heater and cartridge and install flow tech · 58 m away
- 9325 Linkmeadow DrFeb 21, 20251 access hole in concrete 15 foot tunnel to repair sewer under slab · 69 m away
- 9329 Bradner DrSep 16, 2025Repipe from main manifold from behind water heater to behind fridge and to kitchen sink · 70 m away
- 9321 Linkmeadow DrFeb 12, 2025Tunnel under home for whole house sewer repipe.aprox 85ft · 81 m away
- 9428 Linkmeadow DrJun 15, 2026Replacement of complete existing central heat and air system with or without duct work · 91 m away
- 9433 Linkmeadow DrAug 7, 2025Excavate in 2 places in yard and tunnel under slab to expose and repair drain leaks · 101 m away
- 9313 Linkmeadow DrJun 19, 2025Replacement of complete existing central heat and air system with or without duct work · 109 m away
- 9420 Bradner DrOct 5, 2026Express: replace 6 windows like for like · 117 m away
- 3107 Nesbit DrMay 22, 2024Replace old damaged panel. bus bar has been damaged by storm possibly. replace panel or bus bar · 130 m away
- 9416 Bernoulli DrAug 13, 2024Replacement of complete existing central heat and air system with or without duct work · 143 m away
- 9401 Bernoulli DrMay 29, 2025Express: install 15 steel piles for foundation repair · 159 m away