9421 Linkmeadow Dr
Austin, TX 78748
9421 Linkmeadow Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 9421 Linkmeadow Dr, Austin, TX 78748. The most recent, filed December 19, 2023, covers: “Replace the water heater and cartridge and install flow tech”.
Compiled from City of Austin records · updated Dec 19, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 19, 2023
- since Dec 19, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplace the water heater and cartridge and install flow tech
- AppliedDec 14, 2023
- IssuedDec 19, 2023
- !WorkDec '23 – Jun '24
- Final inspection
Marked expired Jun 17, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace the water heater and cartridge and install flow tech
Replace the water heater and cartridge and install flow tech
City of Austin permitPlumbing PermitExpired- Record
- 2023-159706 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9421 Linkmeadow Dr
What is being built at 9421 Linkmeadow Dr?
The latest filing (City of Austin permit 2023-159706 PP, December 19, 2023) covers replace the water heater and cartridge and install flow tech.
How many permits and filings does 9421 Linkmeadow Dr have?
1 filing across 1 project, from December 19, 2023 to December 19, 2023.
Is there other construction near 9421 Linkmeadow Dr?
Yes. Nearby filings include 9416 Linkmeadow Dr (tub to shower replacement (prefab base) in the same location, Oct 6, 2026); 9433 Linkmeadow Dr (excavate in 2 places in yard and tunnel under slab to expose and repair drain leaks, Aug 7, 2025); 9428 Linkmeadow Dr (replacement of complete existing central heat and air system with or without duct work, Jun 15, 2026).
How do I get alerts for new permits at 9421 Linkmeadow Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 9416 Linkmeadow DrOct 6, 2026Tub to shower replacement (prefab base) in the same location · 35 m away
- 9433 Linkmeadow DrAug 7, 2025Excavate in 2 places in yard and tunnel under slab to expose and repair drain leaks · 50 m away
- 9428 Linkmeadow DrJun 15, 2026Replacement of complete existing central heat and air system with or without duct work · 57 m away
- 9408 Linkmeadow DrJun 8, 2026Express- tub to shower replacement (prefab base) in the same location · 58 m away
- 9416 Bernoulli DrAug 13, 2024Replacement of complete existing central heat and air system with or without duct work · 91 m away
- 9325 Linkmeadow DrFeb 21, 20251 access hole in concrete 15 foot tunnel to repair sewer under slab · 108 m away
- 3107 Nesbit DrMay 22, 2024Replace old damaged panel. bus bar has been damaged by storm possibly. replace panel or bus bar · 112 m away
- 9321 Linkmeadow DrFeb 12, 2025Tunnel under home for whole house sewer repipe.aprox 85ft · 123 m away
- 9413 Bernoulli DrSep 24, 2026100amp panel replacement replacing feeder adding grounding and surge. ae is the electrical provider · 125 m away
- 9329 Bradner DrSep 16, 2025Repipe from main manifold from behind water heater to behind fridge and to kitchen sink · 126 m away
- 9401 Bernoulli DrMay 29, 2025Express: install 15 steel piles for foundation repair · 129 m away
- 9420 Bradner DrOct 5, 2026Express: replace 6 windows like for like · 129 m away