301 W 55th Half St: 1 project on record
City of Austin lists 1 filing across 1 project at 301 W 55th Half St, Austin, TX 78751. The most recent, filed August 25, 2025, covers: “Replacement of an existing water heater remove and replace water heater - 40 gal gas”.
Compiled from City of Austin records · updated Aug 25, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 25, 2025
- since Aug 25, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater remove and replace water heater - 40 gal gas
- AppliedAug 25, 2025
- IssuedAug 25, 2025
- WorkAug '25 – Sep '25
- Final inspectionSep 2, 2025
Passed final inspection Sep 2, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater remove and replace water heater - 40 gal gas
Replacement of an existing water heater remove and replace water heater - 40 gal gas
City of Austin permitPlumbing PermitFinal- Record
- 2025-107409 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 301 W 55th Half St
What is being built at 301 W 55th Half St?
The latest filing (City of Austin permit 2025-107409 PP, August 25, 2025) covers replacement of an existing water heater remove and replace water heater - 40 gal gas.
How many permits and filings does 301 W 55th Half St have?
1 filing across 1 project, from August 25, 2025 to August 25, 2025.
Is there other construction near 301 W 55th Half St?
Yes. Nearby filings include 303 W 55th Half St (replacement of complete existing central heat and air system with or without duct work, Jul 17, 2026); 209 W 55th Half St (interior remodel of sfr, Mar 31, 2025); 206 W 55th Half St (removing walls between the kitchen and living room. replacing windows 35x62in new windows single hung 32x60 meeting requirements for emergency escape. bathroom and kitchen windows rough opening 35x38 new windows 32x36. electrical: rewire laundry room wiring was done outside walls was a fire hazard addition of outlets in hallway and master bedroom. adding insulation to exterior walls. relocation of store gas line see floor plan, Mar 4, 2024).
How do I get alerts for new permits at 301 W 55th Half St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 303 W 55th Half StJul 17, 2026Replacement of complete existing central heat and air system with or without duct work · 17 m away
- 209 W 55th Half StMar 31, 2025Interior remodel of sfr · 64 m away
- 206 W 55th Half StMar 4, 2024Removing walls between the kitchen and living room. replacing windows 35x62in new windows single hung 32x60 meeting requirements for emergency escape. bathroom and kitchen windows rough opening 35x38 new windows 32x36. electrical: rewire laundry room wiring was done outside walls was a fire hazard addition of outlets in hallway and master bedroom. adding insulation to exterior walls. relocation of store gas line see floor plan · 92 m away
- 205 W 55th Half StMar 18, 2025Install new 8.28kw rooftop solar system to existing residential only · 98 m away
- 307 W 55th StOct 16, 2026Base: installing a backup battery system and additional meter socket · 104 m away
- 211 W 55th StDec 19, 2023Replace water yard line from the water meter to the house · 106 m away
- 209 W 55th StMay 22, 2026Interior remodel pulling out existing window and expanding opening to put in a larger window. will be adding a 10 lvl for this · 113 m away
- 311 W 55th StJun 8, 2026Replacement of condenser only condeser & coil · 114 m away
- 404 W 55th Half StJun 22, 2026New detached 2 car garage · 114 m away
- 202 W 55th Half StMay 15, 2025Addition of second story to existing sfr · 118 m away
- 401 W 55th StJun 30, 2025Replacement of complete existing central heat and air system with or without duct work · 120 m away
- 207 W 55th StMar 10, 202540ft water line repair · 123 m away