202 W 55th Half St
Austin, TX 78751
202 W 55th Half St: 4 projects on record
City of Austin lists 4 filings across 4 projects at 202 W 55th Half St, Austin, TX 78751 since February 20, 2025. The most recent, filed May 15, 2025, covers: “Addition of second story to existing sfr”.
Compiled from City of Austin records · updated May 15, 2025
- Projects
- 4
- 4 filings
- Latest filing
- May 15, 2025
- since Feb 20, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledAddition of second story to existing sfr
- AppliedOct 19, 2023
- IssuedMay 15, 2025
- WorkMay '25 – Apr '26
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
4 projectsAddition of second story to existing sfr
Addition of second story to existing sfr
City of Austin permitMechanical PermitFinal- Record
- 2024-114043 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Addition of second story to existing sfr
Addition of second story to existing sfr
City of Austin permitElectrical PermitFinal- Record
- 2024-114043 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Addition of second story to existing sfr
Addition of second story to existing sfr
City of Austin permitPlumbing PermitFinal- Record
- 2024-114043 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Addition of second story to existing sfr
Addition of second story to existing sfr
City of Austin permitBuilding PermitFinal- Record
- 2024-114043 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 202 W 55th Half St
What is being built at 202 W 55th Half St?
The latest filing (City of Austin permit 2024-114043 MP, May 15, 2025) covers addition of second story to existing sfr.
How many permits and filings does 202 W 55th Half St have?
4 filings across 4 projects, from February 20, 2025 to May 15, 2025.
Is there other construction near 202 W 55th Half St?
Yes. Nearby filings include 206 W 55th Half St (removing walls between the kitchen and living room. replacing windows 35x62in new windows single hung 32x60 meeting requirements for emergency escape. bathroom and kitchen windows rough opening 35x38 new windows 32x36. electrical: rewire laundry room wiring was done outside walls was a fire hazard addition of outlets in hallway and master bedroom. adding insulation to exterior walls. relocation of store gas line see floor plan, Mar 4, 2024); 205 W 55th Half St (install new 8.28kw rooftop solar system to existing residential only, Mar 18, 2025); 209 W 55th Half St (interior remodel of sfr, Mar 31, 2025).
How do I get alerts for new permits at 202 W 55th Half St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 206 W 55th Half StMar 4, 2024Removing walls between the kitchen and living room. replacing windows 35x62in new windows single hung 32x60 meeting requirements for emergency escape. bathroom and kitchen windows rough opening 35x38 new windows 32x36. electrical: rewire laundry room wiring was done outside walls was a fire hazard addition of outlets in hallway and master bedroom. adding insulation to exterior walls. relocation of store gas line see floor plan · 31 m away
- 205 W 55th Half StMar 18, 2025Install new 8.28kw rooftop solar system to existing residential only · 40 m away
- 209 W 55th Half StMar 31, 2025Interior remodel of sfr · 62 m away
- 108 W 55th Half StSep 9, 2024Interior remodel includes larger master bedroom and a half bath retroactive wood deck & extension of wood deck · 62 m away
- 200 W 56th StJun 3, 2026Temp power loop · 70 m away
- 109 W 55th Half StAug 21, 2025P&b 17 sewer line under house · 73 m away
- 202 W 55th StSep 16, 2025New construction of detached 2-story accessory structure 1.5 bath · 89 m away
- 110 W 55th StJul 12, 2024Replace 50 of sewer yard line · 101 m away
- 211 W Koenig LnJul 10, 2024Monument for koenig homes · 103 m away
- 102 W 55th Half StFeb 5, 2025Replace electrical panel with new 125a panel & afci breakers as required and replace existing meter base with 200a meter base · 107 m away
- 301 W 55th Half StAug 25, 2025Replacement of an existing water heater remove and replace water heater - 40 gal gas · 118 m away
- 100 W 55th Half StDec 21, 2023Installation of roof-mounted solar array system and solar battery · 128 m away