groundranger
Historic · latest filing Dec 2023Residential

100 W 55th Half St

Austin, TX 78751

100 W 55th Half St: 2 projects on record

City of Austin lists 2 filings across 2 projects at 100 W 55th Half St, Austin, TX 78751. The most recent, filed December 21, 2023, covers: “Installation of roof-mounted solar array system and solar battery”.

Compiled from City of Austin records · updated Dec 21, 2023

Projects
2
2 filings
Latest filing
Dec 21, 2023
since Dec 21, 2023
Largest scope
—
Listed value
—

Where this project stands

Finaled

Installation of roof-mounted solar array system and solar battery

  1. AppliedDec 18, 2023
  2. IssuedDec 21, 2023
  3. WorkDec '23 – Sep '24
  4. Final inspectionSep 17, 2024

Passed final inspection Sep 17, 2024.

1 contact on this project

Permit & project history

2 projects
  1. Installation of roof-mounted solar array system and solar battery

    Installation of roof-mounted solar array system and solar battery

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Request to disconnect with cdp (contrtactor disconnect program)installation of roof-mounted solar array system and solar battery (with temporary disconnect)

    Request to disconnect with cdp (contrtactor disconnect program)installation of roof-mounted solar array system and solar battery (with temporary disconnect)

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 100 W 55th Half St

What is being built at 100 W 55th Half St?

The latest filing (City of Austin permit 2023-160753 EP, December 21, 2023) covers installation of roof-mounted solar array system and solar battery.

How many permits and filings does 100 W 55th Half St have?

2 filings across 2 projects, from December 21, 2023 to December 21, 2023.

Is there other construction near 100 W 55th Half St?

Yes. Nearby filings include 102 W 55th Half St (replace electrical panel with new 125a panel & afci breakers as required and replace existing meter base with 200a meter base, Feb 5, 2025); 5513 Link Ave (base: installing a backup battery system and additional meter socket, Oct 28, 2026); 5511 Link Ave (upgrade of existing overhead service to 200 amps to include current codes and standards, Sep 28, 2026).

How do I get alerts for new permits at 100 W 55th Half St?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78751

More solar installs in 78751.

Email me when a new permit is filed