102 W 55th Half St
Austin, TX 78751
102 W 55th Half St: 2 projects on record
City of Austin lists 2 filings across 2 projects at 102 W 55th Half St, Austin, TX 78751 since December 15, 2023. The most recent, filed February 5, 2025, covers: “Replace electrical panel with new 125a panel & afci breakers as required and replace existing meter base with 200a meter base”.
Compiled from City of Austin records · updated Feb 5, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Feb 5, 2025
- since Dec 15, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace electrical panel with new 125a panel & afci breakers as required and replace existing meter base with 200a meter base
- AppliedJan 29, 2025
- IssuedFeb 5, 2025
- WorkFeb '25 – Apr '25
- Final inspectionApr 3, 2025
Passed final inspection Apr 3, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplace electrical panel with new 125a panel & afci breakers as required and replace existing meter base with 200a meter base
Replace electrical panel with new 125a panel & afci breakers as required and replace existing meter base with 200a meter base
City of Austin permitElectrical PermitFinal- Record
- 2025-011309 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Water heater replaced
Water heater replaced
City of Austin permitPlumbing PermitFinal- Record
- 2023-159615 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 102 W 55th Half St
What is being built at 102 W 55th Half St?
The latest filing (City of Austin permit 2025-011309 EP, February 5, 2025) covers replace electrical panel with new 125a panel & afci breakers as required and replace existing meter base with 200a meter base.
How many permits and filings does 102 W 55th Half St have?
2 filings across 2 projects, from December 15, 2023 to February 5, 2025.
Is there other construction near 102 W 55th Half St?
Yes. Nearby filings include 100 W 55th Half St (installation of roof-mounted solar array system and solar battery, Dec 21, 2023); 108 W 55th Half St (interior remodel includes larger master bedroom and a half bath retroactive wood deck & extension of wood deck, Sep 9, 2024); 5513 Link Ave (base: installing a backup battery system and additional meter socket, Oct 28, 2026).
How do I get alerts for new permits at 102 W 55th Half St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 100 W 55th Half StDec 21, 2023Installation of roof-mounted solar array system and solar battery · 22 m away
- 108 W 55th Half StSep 9, 2024Interior remodel includes larger master bedroom and a half bath retroactive wood deck & extension of wood deck · 46 m away
- 5513 Link AveOct 28, 2026Base: installing a backup battery system and additional meter socket · 57 m away
- 109 W 55th Half StAug 21, 2025P&b 17 sewer line under house · 61 m away
- 5511 Link AveSep 28, 2026Upgrade of existing overhead service to 200 amps to include current codes and standards · 62 m away
- 101 W Koenig LnJan 26, 2024Commercial re-roof (metal retrofit - tpo overlay) - remove existing eps flute fill 1/2 fiberboard and 60 mil tpo to the existing metal roof and replace with new eps flute fill 1/2 fiberboard and 60 mil tpo · 88 m away
- 104 W 55th StMay 18, 2026Express - replace three existing old windows by installing three new size for size replacement windows · 97 m away
- 5503 Link AveJun 19, 2025Replacement of an existing water heater removed tank type water heater in attic and installed tankless water heater on exterior wall · 103 m away
- 202 W 55th Half StMay 15, 2025Addition of second story to existing sfr · 107 m away
- 110 W 55th StJul 12, 2024Replace 50 of sewer yard line · 114 m away
- 5512 Avenue FDec 4, 2025Addition to rear of home to include new bathroom den mudroom and covered porch · 114 m away
- 5516 Avenue FApr 8, 2025Replacement of complete existing central heat and air system with or without duct work m · 118 m away