groundranger
Historic · latest filing Feb 2025Residential

102 W 55th Half St

Austin, TX 78751

102 W 55th Half St: 2 projects on record

City of Austin lists 2 filings across 2 projects at 102 W 55th Half St, Austin, TX 78751 since December 15, 2023. The most recent, filed February 5, 2025, covers: “Replace electrical panel with new 125a panel & afci breakers as required and replace existing meter base with 200a meter base”.

Compiled from City of Austin records · updated Feb 5, 2025

Projects
2
2 filings
Latest filing
Feb 5, 2025
since Dec 15, 2023
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replace electrical panel with new 125a panel & afci breakers as required and replace existing meter base with 200a meter base

  1. AppliedJan 29, 2025
  2. IssuedFeb 5, 2025
  3. WorkFeb '25 – Apr '25
  4. Final inspectionApr 3, 2025

Passed final inspection Apr 3, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Replace electrical panel with new 125a panel & afci breakers as required and replace existing meter base with 200a meter base

    Replace electrical panel with new 125a panel & afci breakers as required and replace existing meter base with 200a meter base

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Water heater replaced

    Water heater replaced

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 102 W 55th Half St

What is being built at 102 W 55th Half St?

The latest filing (City of Austin permit 2025-011309 EP, February 5, 2025) covers replace electrical panel with new 125a panel & afci breakers as required and replace existing meter base with 200a meter base.

How many permits and filings does 102 W 55th Half St have?

2 filings across 2 projects, from December 15, 2023 to February 5, 2025.

Is there other construction near 102 W 55th Half St?

Yes. Nearby filings include 100 W 55th Half St (installation of roof-mounted solar array system and solar battery, Dec 21, 2023); 108 W 55th Half St (interior remodel includes larger master bedroom and a half bath retroactive wood deck & extension of wood deck, Sep 9, 2024); 5513 Link Ave (base: installing a backup battery system and additional meter socket, Oct 28, 2026).

How do I get alerts for new permits at 102 W 55th Half St?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78751
Email me when a new permit is filed